FLU
BP
IB
100

Who's responsible for ensuring trailer is cleaned out after completed?

Coordinator 

100

True or False. You should work from the back of the skates?

False

100

True or False. You should hand unload clamp freight?

False

200

What tools should you use to induct double stacked pallets on the line?

Step stool

200

Where do you find your performance?

Board in the front 

Asking a leader

200

Where should the green and white label be placed on a crossdock pallet?

Top right corner of the left side of the pallet

300

How many minutes should a trailer transition take?

3 minutes

300

What equipment should you have accessible to perform breakpack functions?

Gladiator/Printer

Empty BP Boxes

Tape/Labels 

Trash bag

300

What 3 things should you have readily available during operation? 

RF Device

Box Cutter

Gloves

400

How many hours should it take to receive fluid rejects after the trailer is closed?

2 hours

400

When should overages, misreceived freight, open tasks, putaway, and research be completed by?

By End of Shift

400

True or False. Associate should validate suggested disposition and notify supervisor if incorrect 

True 

500

What is the ABC plan for your area?

Induct on assigned line

Move to next line with freight

Get with leader


500

What is the ABC plan in your area?

Receive/put

Throw CCS

Induct on Panda line

500

What is the ABC plan for your area?

Unload

Receive

MHE


M
e
n
u