Roles & Responsibilities
Meetings & Discovery
Implementation
Go-Live
Post Go-Live Metrics & Quality
100

This person leads the referral order redesign process (with Boost support)

Who is the Referrals OPM?

100

What is the key difference between a discovery site visit and an initial clinical meeting?

What is the audience (clinical meeting introduces the project and sets the stage before site visits)?

100

This team rolls out the finalized templates and pattern changes before go-live.

Who is Capacity Management?

100

This communication tool supports real-time collaboration during go-live.

What is the Teams Group Chat for practice support?

100

This data is used to evaluate success and is pulled for use in 30/60/90 day slide decks.

TTA New

Referral Conversion 

Schedule Utilization

No Show Rate

Online Scheduling Rate

Decision Tree Utilization

200

This person prepares the slide deck and leads the Project Kickoff meeting.

Who is the GS OPM?

200

These people from the clinic should be included in Discovery meetings.

Who are the PM, Scheduling SME, and Referral Coordinator SME?

200

This report is pulled from Epic to track how often decision trees are used

What is the decision tree usage report?

200

This team leads post go-live support like issue tracking, touchpoints, and transitioning to long-term maintenance.

Who is the SI Team (with support from OPM/Coordinator)?

200

This person or team is responsible for creating the 30/60/90-day slide decks.

Who is the Quality Lead or Quality Team?

300

This team populates the Homework Tool with visit type data.

Who is Capacity Management?

300

These internal team members should be included in Discovery invites.

Who are the GS OPM/Program Manager, Director/Coordinator/QL, Capacity Management (CM) analyst/manager, and Access Center Manager/Director

300

This task ensures the diagnosis list used for decision tree development is current and accurate.

What is confirming the diagnosis list on the diagnosis matrix?

300

This report is pulled from Epic to measure decision tree adoption.

What is the decision tree usage report?

300

This is the long-term goal once post-go-live support is completed.

What is the transition to long-term maintenance?

400

This person makes the first-pass recommendations for visit type alignment.

Who is the GS OPM?

400

This individual is our contact at the Transformation Office.

Who is Joelle White?

400

This visual tool is drafted early in the process and references discovery questions, subgroup Excel, and visit type alignment.

What is the decision tree Visio?


400

After two weeks post go-live, all concerns should transition from direct email to this method.

What are support tickets?

400

These updates are eventually merged with access center communications for streamlined reporting.

What is combining touchpoints with Access Center updates?

500

This type of training is created near the end of decision tree creation and focuses on specialty-specific workflows.

What is the instructional design tip sheet?

500

Who can explain what the Transformation Office does?

These are a system-level group of program managers that provide support for workstreams and workgroups with the Forward Together 2030 initiative. 

500

This phase is repeated as needed to ensure all RFVs are properly mapped and reviewed.

What is the Design and Build & Test cycle?

500

How long before decision trees go live do template updates go live? 

1 day

500

How often will we meet with specialties after go-live for sustainment?

Every 6 months