Capability: Know-how of the Supplier ≥ ________ ______
Customer request
Mention a mandatory study for Aptitude detection (capability) during Validation of the Product/process
GRR
What is the scope for CLI02-01-020/01 : APPROACH TO DEPENDABILITY ?
Complex Product or Product with ASIL (Automotive Safety Integrated Level ) level requested by the customer.
The PLM is part of the AKWEL Group standard validation committee?
True
False
True
The _______ opens an ECR according to CLI02-01-003 to analyze the impact (technical and economic) on the project but also on other projects that use this standard
requester
Complete
The know-how of the Supplier is translated by his aptitude to produce these characteristics while controlling the _______ and _________ of
manufacture (fluctuations) of its manufacturing processes
position /dispersion
The Process Capability
(Cp & Cpk)
(Pp & Ppk)
Are recommended during Increased production rate
Confirmation ?
True
False
False
The use of lessons learned is done at all stages of design and industrialization but also during the ____ _____ by exploiting existing data
RFQ phase
If the generic AKWEL standards by product family are missing, incomplete and/or not adapted to the requirements, the __________ asks the COE or PLIM to create or develop the AKWEL standard
a) Project Team
b) PLM
c) PLIM
project team
What is the category of a ECR to update Standards?
AKWEL STANDARD
This tool... help to increase the maladjustment correction speed and contribute to the reduction of the quantity of the non-compliant manufactured products
SPC charts
If this is seen
Cpk or Ppk ->
Cp or Pp ->
Means:
a) The manufacturing dispersion increases
b) The performances of the process are stable
c) Decentring decreases
b) The performances of the process are stable
Complete
___ ______ __ _______manager is responsible for Product, methods of test for laboratory and CMM and test departments and also the product Norms.
The Center of Excellence
Any creation or modification of an AKWEL standard that concerns a product family or a process in place at AKWEL must be managed with _________ according to with an ECR and managed by the Project manager with the support of COE and/ or PLIM
CLI02-01-003
What is the appendix used for AKWEL standard ECR for transverzalization?
Appendix 7
Standard Implementation Impact Analysis
Abbreviation for
Measurement of Repeatability and Reproducibility
Grr
If this is seen
Cpk or Ppk />
Cp or Pp \>
Means:
a) Decentring decreases but the manufacturing
dispersion increases.
b) The performances of the process are stable
c) Decentring decreases
a) Decentring decreases but the manufacturing
dispersion increases.
Complete
___ ______ ____ ______is responsible of customer satisfaction and for their application on the new projects and modifications.
The Product Line Manager
The ECR is necessary also for a new std creation
True
False
False
Who can refuse to apply a Standard (per budget, life duration, equipment in place) for Process?
The EVPO
Tell what is the PPM translation of a CpK of 1.67
0.5 ppm
What are the uses of statistical data?
Identify the manufacturing dispersion of our means of production,
quickly check if an existing process is able to answer more demanding requirements on a new product
The will be able to exploit the information to take correct decisions, as eventual new adjustments, consequence of the data.
Complete
___ _______ ____ _________ Manager is responsible for the process and methods of measurement and calibration for CMM
The Product Line Industrialization
A standard needs to be updated following an
8D (incident or scrap analysis)
True
False
True
Who can refuse to apply a Standard (per budget, life duration, equipment in place) for Product?
PLD