Job Titles
Tasks
Sales/Occupancy
Safety
Homes
100

What is Shawn Halladay's Job Title?

Vice President of Field Operations

100

What date is safety audit due by?

The 20th
100

What is an organic move-in?

It occurs when a customer physically moves their manufactured home into a Lakeshore community.

100

What does PPE stand for?

Personal Protective Equipment.

100

What three utilities or systems should be checked when inspecting a vacant inventory home?

water, power, plumbing fixtures, appliances, heating, and air conditioning.

200

What is Manuel Rodriquez Job Title?

Safety and Maintenance Supervisor

200

What time should all leads be called?

10am

200

According to the sales training manual--what is the definition of an A lead?

Ready, willing, and able to purchase soon

200

What two pieces of lifesaving equipment must be accessible in the pool area?

A life ring and a rescue hook.

200

After power is connected to a newly delivered home, what temperature should the air conditioner be set to?

82 degrees.

300

What is Talia Johnson's Job Title?

Community Financial Coordinator

300

When is the newsletter due everything month?

27th

300

What is a Value Home?

home that still needs some repairs or improvements but meets Lakeshore’s minimum standards to be sold.

300

What two actions must a Maintenance Technician take when damaged playground equipment presents a safety concern?

Notify the Community Manager and caution off the unsafe area.

300

Before a demolition home is removed, what utility-related safety action must be completed?

All utilities must be shut off, and proof of the shutoff must be provided to the home hauler.

400

What is Brian Kessinger Job Title?

Title Assistant Director of Capital Improvements

400

When day and time should payroll be entered and completed?

Friday by 12pm

400

What is economic occupancy?

It includes sites with homes that were charged rent and are not in legal, bankruptcy, or abandoned status, and that do not owe more than one month’s average rent.

400

In what four locations are fully stocked first-aid kits required?

The maintenance shop, office, maintenance trucks, and golf carts.

400

What form must be completed as soon as a newly delivered home is placed on its lot?

The Home Delivery Notification.

500

What is Yuval Kadim Title?

Chief Financial Officer

500

When is the Executive Summary due?

Every Thursday 

500

Name three transactions that increase occupancy

Increases include rental move-ins, inventory-sale move-ins, and organic move-ins

500

What must be done with the sewer connection at a vacant homesite?

The sewer must be properly snaked and capped.

500

Before a new home arrives, how high must the sewer riser be stubbed, and what color must it be painted?

The riser must be stubbed up 18 inches and painted green.

M
e
n
u