100

These stakeholders prepare shop drawings which are used to explain items identified in the contract documents.

contractor/supplier/subconsultant/fabricator

Who is the fabricator, supplier, & contractor?

100

The best tool to view the character of the site.

aerial photography/GIS/site observation/boundary survey

What is site observation?

100

These substances form the building blocks of all soils.


sand/gravel/clay/top soil/loam/silt

What are sand, silt, and clay. 

100

This is controlled by erosion techniques.

water/slumping/streams/sediment

What is sediment?

100

The amount of minutes during the exam for bathroom break.

15/20/30/45

What is thirty minutes?

200

All communication between the LA and the sub-contractors should be directed through which stakeholder.

owner/general contractor/city inspector/sub-contractor

Who is the general contractor?

200

Existing street ROW and utility easement info. is found on this resource.

boundary survey/topographic map/aerial photo/infrared image

What is boundary survey?

200

The binding material in bituminous paving.


oil/sand/asphalt/cement

What is asphalt?

200

These are used to create an intimate space rather than creating total enclosure.

ground cover/medium shrubs/tall shrubs/small canopy trees

What are small canopy trees?

200

Questions that will not be scored and will not have an impact on your results.

pre-test items/sample questions/trial questions

What are pre-test items?

300

This information is typically shown on a base map.


ownership info/easements/rights-of-way/topography

What are easements, rights-of-way, topography, & ownership info. 

300

This parking lot configuration requires the widest aisle.

one-way parallel/45 degree/60 degree/90 degree

What is 90 degree?

300

2RxT=26 is the formula to determine what ratio.

slab thickness and radius/step tread and riser/reinforcement spacing/overlap spacing

What is the ratio between step riser and tread?

300

This spacing should be provided during the installation of parallel composite deck boards?

0"-1/16"-3/16"-1/2"

What is 3/16" spacing?

300

The forms of valid and current identification that can be presented to the testing center.

driver's license/credit card/passport/student ID card/ATM card

What are driver's license, credit card, passport, and ATM card? 

400

They have the legal authority to issue a change order?

landscape architect/owner/general contractor/code officer

Who is the owner?

400

The most suitable area for development on coastal dune.

primary dune/back dune/secondary dune/trough

What is the back dune?

400

The slump test measures the ratio of cement to this.

sand/gravel/compression/water

What is water?

400

The specification used when only one light fixture meets project requirements.

performance/proprietary/descriptive/nonrestrictive

What is proprietary?

400

LARE is a four-letter acronym to describe what?

What is the landscape architect registration examination?

500

Programming and market studies are usually performed during which phase/s.

site analysis/schematic design/conceptual design/pre-design services

What is pre-design services?

500

This soil characteristic shall be considered when locating a structure.

bearing capacity/permeability/density proctor/soil erodibility

What is bearing capacity?

500

This section of CSI Specification contains landscaping.

one/three/eight/two

What is section two?

500

Which three kinds of information should be placed in specifications and not in drawings per the 'single statement' principle.

physical relationship of materials/quality and types of materials/methods of installation/expected results

What are the quality and types of materials, methods of installation, and expected results?

500

These guidelines form the basis of our professional standards.

code of professional ethics, CLARB juris prudence, code of environmental ethics, LARE Candidate agreement

What are the codes of professional and environmental ethics? 