The time-phased resource expenditure plan set by CAM's at the program's outset.
Presented to the customer as part of an Integrated Review process to get their "buy in".
The basis from which future project changes will be made.
What is the baseline?
100
A modification to make a new, improved, advanced, or next generation feature is this type of change.
What is a Product change.
100
A change in integration, profitability, culture, size, out-sourcing, reputation, or mission is this type of change.
What is Organizational change?
100
What are the number of change phases?
What is Three?
100
The change cycle all projects go through.
What is the Dynamics of Change?
200
Project change at Northrop Grumman is nearly always initiated by people in these job functions.
Changes are made to the baseline by people in this other job function.
What are CAM's, IPT's, and PM's?
What are FA's?
200
The Project Management triple constraint triangle includes Cost, Schedule, and this.
What is Scope?
200
A company opening a new plant in a foreign country is this type of organizational change.
What is out-sourcing?
200
This is the first phase in the Change Management Process.
What is Create Conditions for Change?
200
When confronted with change, this is the typical response.
What is resist?
300
This is the document used to make changes to the project baseline.
This is the document used to make changes to the Estimate at Complete.
What is a Budget Baseline Revision (BBR)?
What is a Revised Estimate at Complete (REVAC)?
300
Major changes and modifications to the product must be approved by this group of people.
Who are the project stakeholders?
300
The institution of Affirmative Action in 1961 is an example of this type of organizational change.
What is cultural?
300
This is the second phase of the Change Management Process.
What is Make Change Happen?
300
As the project moves forward, the team will do this to deal with the changes encountered.
What is adapt?
400
When a baseline task is changed and becomes more expensive, funding typically comes from one of these two places.
What are other tasks or MR?
400
The best method for countering or preventing a product change is to do this?
What is to understand the customer's needs and expectations before beginning work and have a thorough risk management plan.
400
An increase in marketing or advertisements campaigns can cause this type of organizational change.
What is reputation?
400
This is the third phase in the Change Management Process.
What is Make Change Stick?
400
Once changes occur and the project has adapted to the issues in hand, the project will do this.
What is stabilize?
500
According to the DCMA, baseline changes can not be made in these time periods.
What are the current month and the past?
500
This factor could cause a product to become obsolete or ineffective or even cause the cancellation of a project in mid-cycle.
What is an advancement in technology?
500
This Northrop Grumman organization was created to enable employees, mainly new hires, to network in both professional and social settings.
What is NEAT or Connect1NG?
500
These are the three main players with whom the change agent must work with throughout the process.
Who are the Sponsor, Advocate, and Target.
500
Throughout the life cycle of a project, the anxiety level experiences this type of fluctuation.