MUDA
5S
STANDARD
JIT
JIDOKA
200

A Japanese word that means waste or any activity the customer is unwilling to pay for.

MUDA

200

The 5S step that elevates the work area by thoroughly cleaning and inspecting tools, equipment, and other items.

Shine

200

Is there one best way to do something according to lean thinking? (True or False)

False

200

A system of visual tools (usually signal cards) that synchronize and provide instruction to suppliers and customers both inside and outside the plant.

Kaizen

200

Defined by Toyota as “automation with a human mind”.

Jidoka

400

One example of conveyance is when one fixes a defective product. (True or False)

False

400

One example of Sustain is to perform periodic check-ins after initial training. (True or False)

True

400

The safest, easiest, and most effective way of doing a job.

Standardized Work

400

In a period of low economic growth, _________ is a crime. (Taiichi Ohno)

Overproduction

400

Jidoka aims for zero ______?

Defects

600

A subtle form of MUDA related to doing more than what the customer requires.

Overprocessing

600

What is the 4th step in the 5S system?

Standardize

600

This chart determines the capacity of the machines in a process. It documents machine and manual times and allows us to identify bottlenecks at a glance.

Production Capacity Chart

600

If an asset’s utilization rate increases above __%, without other changes, cycle times increase exponentially.

80%

600

Any method or device that either detects abnormal situations before they occur or, once they occur, stops the line to prevent defects.

Poka-Yoke

800

Refers to any motion that adds value to the product or service.

Actual work

800

This 5S step organizes and identifies storage for efficient use and is initially called "Seiton."

Set-in-order

800

 What is Daily operating time ÷ Required quantity per day

Takt Time

800

What type of fixed conveyance is a city bus service?

Fixed time conveyance

800

Jidoka allows to ____ production for long-term continuous production.

stop

1000

A type of MUDA that occurs when there is excessive work-in-process because of large batch production, equipment problems downstream, or defects requiring rework.

Delay

1000

Which phase of 5S uses a red tagging system where one marks the items for removal or further evaluation?

Sort

1000

What type of layout is this? Machines are side by side and have minimal inventory. One piece is made at a time. When a piece is processed, it moves to the next process

Cells

1000

If a store ran out of a specific part, what type of kanban should a customer hand to the store?

Withdrawal Kanban

1000

What poka-yoke sensing devices try to detect in general?

Abnormalities

M
e
n
u