100
A lean fundamental that is based on takt time, work sequence, and standard work-in-process.
What is standard work?
100

Acronym formed from the words Suppliers, Inputs, Process, Outputs, Customers


What is SIPOC?
100

It is a systematic, structured problem-solving process

What is an A3 or A3 Thinking?
100
Resource that can be used to identify Lean Champions and Lean events at S3?
What is the Lean at S3 collaboration site?
100
Acronym used to define the 8 wastes in Lean
What is TRIMWOOD?
200
Creating more value with fewer resources.
What is Lean?
200
This "S" within 5S is typically the most difficult
What is Sustain?
200
This concept creates value to the customer by reducing waste.
What is Lean?
200
Where else besides a physical setting can 5S be applied?
What are virtual or electronic environments?
200
The most common of the 8 wastes in Lean
What are Defects?
300
A Lean practice that supports huddles and problem solving.
What is Daily Engagement or a Daily Engagement System?
300
This scheduling system maintains inventory levels by sending signals to produce and deliver a new shipment as material is consumed.
What is kanban?
300
A practice that focuses on continuous improvement. In Japanese it means improvment.
What is Kaizen?
300
An ongoing effort to improve products, services, and processes.
What is continuous improvement?
300
Box 5 of an A3 captures these.
What are Tests and Experiments?
400

A well defined one of these includes the duration, where, what, magnitude, and results in.

What is a Problem Statement?
400
A lean manufacturing technique used to analyze and design the flow of materials and information required to bring a product or service to a consumer.
What is Value Stream Mapping?
400
A technique or tool used to validate existing data or obtain more data through first-hand observation.
What is Gemba?
400
Allows a team to identify, explore, and graphically display the possible causes related to a problem or condition to discover its root causes
What is a Fishbone or Cause and Effect diagram?
400
Includes decisions points, which a VSM does not, and shows complexity, process loops, and handoffs
What is a Workflow Process Diagram or Process Flow Map?
500
The system that Lean manufacturing is based on.
What is the Toyota Production System (TPS)?
500
The Japanese word for waste.
What is muda?
500
This focuses efforts on problems that offer the greatest potential for improvement by showing their relative frequency/size in a descending bar graph.
What is a Pareto or Frequency of Occurrence chart?
500
Another name for the Pareto Principle.
What is the 80/20 rule?
500
A four-step method used for the control and continuous improvement of processes, products, and services.  An A3 is based on this.
What is Plan-Do-Study-Act (PDSA)?