An estimation made by a person with a great deal of experience is this type of time study.
What is expert opinion.
100
This is free power.
What is gravity.
100
The square on a process chart represents this.
What is inspection.
100
This is a unit of work that cannot be subdivided.
What is an element.
200
This is a schedule system where the output is pulled by the need for a final product.
What is pull system
200
This is the ratio of savings due to an improvement and the investment.
What is ROI.
200
This is the most expensive fixture.
What are hands.
200
Doing this to a step can save the most, but is the most difficult and rare.
What is eliminating a step.
200
This chart can be used to determine hoe many machines a person can operate.
What is multimachine chart.
300
The difference between specification tolerance and process variation in ppm
What is six sigma
300
"He never works," is an example of this time study technique.
What is work sampling.
300
Doing the right things or job
What is effectiveness
300
Materials moving backward in a plant is this.
What is backtracking.
300
A blank space on a left hand/ right hand chart.
What is one arm bandit
400
Business model and collection of tactical methods that emphasize eliminating waste while delivering quality products on time at least cost with greater efficiency.
What is lean manufacturing
400
This is used during the planning phase of a new product development program.
What is PTSS
400
Doing the things right or method
What is efficient
400
This chart combines the operations chart with the process chart.
What is flow chart.
400
This chart displays body parts.
What is SIMO.
500
The acronym PDCA stands for this continuous improvement process.
What is plan, do, check, act
500
The time required to produce a product at a work station with the following three conditions: a qualified, well trained operator, working at a normal pace, and doing a specific task.
What is time standard.
500
This studies body shape among different populations.
What is anthropometry
500
This is a collection of equipment used to make a single complicated part.
What is work cell.
500
This chart is used when there are three or more operators.