CFD1
Lean Office
6S
Definitions
MISC
100
Abbreviated AED.
What is Automatic External Defibrillator?
100
Kaizen, Lean Manufacturing, Toyota Production System, Ohno System, Minimum Inventory Production System and Material As Needed (MAN) system.
What is Names For CI?
100
Determine what is necessary for the job and get rid of what is unnecessary.
What is SORT?
100
A business strategy which focuses on process improvement in incremental steps.
What is Continuous Improvement (CI)? or What is Lean?
100
Continuous Improvement methodology which believes these are good because they allow us to use our minds and collaboration methods to solve?
What is Problems?
200
Fred Charlton
Who is the current Fire Chief?
200
Breaking through traditional ways of solving problems.
What is Thinking Outside the Box?
200
Keeping the work area clean and inspecting for potential issues.
What is SHINE?
200
Defines the character of the organization made up of elements including: values, vision, rituals, routines, symbols, structures, business process both documented and undocumented.
What is CULTURE?
200
If sustainment in your organization is not working this individual often referred to as the "Pain Train" may be able to assist.
Who is Terry Tate?
300
11300 SE Fuller Road
What is the Administration Building address?
300
An activity that transforms material or information into something the customer wants and is willing to pay for.
What is VALUE ADDED?
300
Having the necessary items to do the job readily available at the point of use.
What is SET IN ORDER?
300
Going to where the value is created e.g. the workplace.
What is GEMBA?
300
This extract was mistaken for poison?
What is extract of Lama?
400
A 16' Maravia Cataraft with inflatable PVC side tubes and aluminum frame.
What is CAT 8?
400
Includes such things as Defects, Inventory, Transportation, Motion.
What is 8 PRIMARY WASTES IN BUSINESS?
400
Includes things such as Standard Work, visual controls and maintaining good practices.
What is STANDARDIZE?
400
A system to prevent errors.
What is POKA YOKE?
400
Last years civil war game winner and most likely winner this year.
Who is Oregon Ducks?
500
E.D.I.T.H
What is Exit Drills In the Home?
500
Specify and focus on value, identify the value stream, allow value to flow without interruptions, let the customer pull value and continuously persue perfection.
What is THE FIVE PRINCIPLES OF LEAN THINKING?
500
Leadership at all levels, reporting results, and developing accountability.
What is SUSTAIN?
500
Process that visually displays and captures information and process flows along with metrics athat allow individual and total process time to be calculated. Can be used to help identify opportunity in a process.
What is VALUE STREAM MAPPING?
500
Hoshin Kanri
What is another name for Policy Deployment
M
e
n
u