LSS Character/Roles
Project Metrics
Tools and Methodologies
Project Charter
SIPOC
100

An introductory level of Lean Six Sigma practitioners

White Belt

100

The direct measurable metrics of the process that produces a product or service. This is the main success measure of the project

Primary Metrics

100

Tool to use for Low Hanging Fruits. Usually the root cause is already understood.

Go Do It or Just Do It

100

What are the basic component of a Problem Statement?

5W and 2H

100

What is SIPOC stand for?

Supplier, Input Process, Output, Customer

200

Lean Six Sigma practitioners that usually a member of a project: Has basic understanding of all the tools required and expert to their own process.

Yellow Belt

200

This Metric usually improves as the primary metric is improved. It is not directly related to the project but will give additional information that will help achieve the goal

Secondary Metric

200

A simple 5 step method where the potential root cause of a problem is unknown

A3

200

a Goal/Objective Statement framework

SMART or SMAART

200

This is a high level view of the project scope. Usually contains 5-7 blocks

Process

300

Leads improvement projects and is limited to their own process, control areas, or expertise

Green Belt

300

What is CTQ stands for and what does it mean?

Critical to Quality are the translation of customer needs into quantified requirements for our product/service

300

A reactive method for eliminating root cause from ‘Customer facing’ issues

8D

300

Why is Scoping important?

Avoid scope creep.

A six sigma project cannot solve world hunger.

300

This defines the outcome of the product or service.

Customers

400

A project leader for complex projects that may involve several areas. Usually a Mentor/Coach to smaller projects and conduct/facilitates training.

Black Belt

400

What is VOC and what does it mean to your project?

Voice of the Customer:

Reactive Information comes from Customers

Proactive Information is gathered by reaching our to customers

400

An accelerated improvement event often focused on reducing waste and increasing efficiency, where speed is important

Kaizen Events

400

What is a project Charter

It is a one page living and breathing document that represents the project. This keeps everybody aligned and focused.

400

What type of process Map that contains the Owner and detailed steps.

Swim Lane

500

A project leader for complex and End to End projects. Usually a Mentor/Coach to smaller projects and conduct/facilitates training. Can be able to certify lower belts.

Master Black belt

500

Define Quality

Quality is always measured based on Customer perspective/specifications.

500

Improvement projects to address systemic process issues that require a detailed understanding of root causes

Lean Six Sigma

500

What are the elements of a project Charter?

Project Description & Scope

Problem Statement/Challenges

Goal and Measures (indicators)

Objective Statement

Stakeholders & Team Members

Schedule / Time-line

Risks & Constraints

500

visualize the flow of material and information that is needed to bring your product to the customer

Value Stream Map

M
e
n
u