LEED Process
USGBC
Sensitive Land
Integrative Process
Location & Transportation
100

Total points available in the LEED rating system

What are 110 total points?

100

Number of rating system adaptions and credit categories

What are 21 adaptations and 8 categories?

100

Prime farmland, flood plains & wetlands are all considered?

What are sensitive land types?

100

This project type within BD+C has an Integrative Process Prerequisite: "Integrative Project Planning and Design"

What is Healthcare?

100

A site whose perimeter adjoins currently developed land with urban uses

What is an infill site?

200

Length of time that a project team can wait to submit for construction phase review

What is no later than 2 years after the project is substantially complete?

200

Handles all LEED products and services

What is USGBC?

200

This site is the best choice if the project wants to qualify for LT Credit Sensitive Land Protection

What is a previously developed site near similar projects?

200

During what phase must you establish an energy performance target? 

What is no later than SD?

200

Locating a project on a brownfield helps to achieve this LT Credit

What is LT Credit High Priority Site?

300

Rule that defines which rating system should be selected based on gross floor area of the LEED project building or space.

What is the 40/60 rule?

300

A third-party organization that provides independent oversight of professional credentialing and project certification programs related to green building

What is GBCI?

300

A project team that selects a high-priority site is likely to also fulfill the requirements of which other credit? 

What is LT Credit Sensitive Land Protection?

300

To support high-performance, cost-effective, equitable project outcomes through early analysis of the interrelationships among systems

What is the intent of the Integrative Process Credit? 

300

This is the maximum distance from a functional entry to transit stops in order to obtain the LT Access to Quality Transit Credit 

What is 1/4-mile (400-meter) walking distance from planned bus/transit stop or 1/2-mile to a rapid transit station?

400

Managing 100% of the rainwater that falls within the project boundary would obtain which type of credit?

What is exemplary performance?

400

Names and photos of credentialed individuals are published here

What is the USGBC directory?

400

This is the minimum distance from wetlands required to comply LT Credit Sensitive Land Protection

What is at least 50 feet (15 meters) from wetlands?

400

Two possible "Discovery" systems that can be analyzed in order to achieve the IP Credit

What are:

Energy related systems, water related systems, site selection, social equity, health & wellbeing?

400

Locating a LEED BD+C project within this LEED Certified location will maximize the number of points in the L&T category

What is LEED v4 LEED Neighborhood Development (ND) Certified Plan?

500

A project was registered in January of 2013. In April 2013 USGBC published Addenda for a credit the project team is pursuing. Which version is used to evaluate the credit?

The project team can choose to follow any addenda published after April, 2013

500

How USGBC supports its mission (4 things)

What are education programs, advocacy, research, network of local chapters, LEED green building program?

500

A project team can place an impervious pedestrian pathway here while still earning LT Credit Sensitive Land Protection

What is within a wetland buffer?

500

Integrative Process Facilitator provides a summary of the team’s integrative process approach and the differences it made in terms of improving interaction and performance

What describes the implementation portion of the Integrative Process Credit?

500

This is the minimum density required for LT Credit Surrounding Density and Diverse Uses (Option 1 Surrounding Density)

What is a combined surrounding density of 22,000 SF / acre of buildable land?

M