Protection
Primary Services
EGBC
PSSP
Voltage Management
100

Recloser sequences (reclosing intervals) changed from 2s, 5s, 5s to 5s, 15s, 15s primarily for this purpose.

What is to prevent miscoordination with electromechanical relays?

100

BC Hydro requires ______ clearance in front of the service cable compartment to apply safety grounds.

What is 1.5m?

100

BCH's responsible officer is ______ and DE's responsible registrant is ______.

Who is Murray and Samira?

100

Level V equipment may be isolated using _____

What is self protection?

100

VVO stands for ____.

What is volt VAR optimization?

200

____s to ___s time margins provide good coordination for relay to relay coordination (per Protection Coordination Guideline)

What is 0.25s to 0.4s?

200

The minimum length of the pull pit shall be _____ to accommodate cable pulling.

What is 2100mm?

200

The regulatory model is based on these three pillars.

What is ethics, quality management and continuing education?

200

In the device identifier 5D21, the '5' indicates _____

What is the voltage of the equipment is 500kV?

200

Distribution Planning criteria specifies that feeders should maintain a phase current unbalance below _____.

What is 50A?

300

You must ensure automated SWG loadway settings coordinate upstream with the ______ and _______

What is the SWG bus protection and upstream protective device.

300

A customer-owned loadbreak SW installed as a primary service main SW shall have a load breaking current of ______

What is 200A?

300

BC Hydro's Industry of Practice is _____.

What is Government - PGA Defined Government Registrant. 

300

The limits of approach for a qualified worker  working on a 138kV line is _____

What is 1.5m?

300

Customers with a PF below ____ can be charged a surcharge. 

What is 0.9?

400

This needs to be considered when selecting a SWG/CR pickup setting of 375A (assume standard station SEL351 upstream).

What is negative sequence protection.

400

The minimum bending radius for 5" ducts is _____

What is 1050mm?

400

What is the difference between a type 1 and type 2 independent review?

What is a type 1 review can be conducted by a BCH employee, while a type 2 must be completed by an external party?

400

Category ____ or higher workers can obtain protection extensions. 

What is 3?

400

Voltage regulators approved for use on the BCH distribution system are industry-standard, single-phase, ______-step regulators.

What is 33?

500

Define selectivity.

What is protection systems should remove from service the minimum number of system elements necessary to clear a fault. 

500

Utility wireway ground bus has these dimensions.

What is 3" x 0.25"?

500

Where is the DE EIM plan found and what is its purpose?

What is the PGA website and it documents where and how to save specific types of information and deliverables prepared by Professional Registrants?

500

The three types of SPG's are _______.

What are clearances, test and work permits and self protections?

500

Distribution capacitor banks are typically set to operate in _____ control mode. 

What is VAR?