DEFINITIONS
PERSONNEL & TRAINING
HAZARDOUS ENERGY
LOTO DEVICES
6 STEP PROCESS
100

A mechanical device that physically prevents the transmission or release of energy, such as a circuit breaker or disconnect switch

What is an Energy isolating Device

100

An employee who has the appropriate technical background, has completed Lockout/Tagout Authorized Training, has successfully demonstrated that they know how to apply EC/LOTO, and who will perform the work on the system. This could include an electrician or other specialist with knowledge of the equipment.

What is Authorized Employee

100

____________ Energy:

-Relating to springs, rotating parts, etc.

____________ Energy:

•Can be found in capacitors and superconducting magnetic energy storage

What are Mechanical & Magnetic energy

100

Name this LOTO device:

What is Hasp

100

This step includes notifying all affected employees in the area that the equipment is going to be shut down and locked out.

Understand the problem: What needs to be fixed?

Plan: Are the proper tools available?

Prepare: Is the area clear and are warnings posted?

What is Step 1 Prepare for Shut Down

200

A type of key lock that is used for no other purpose in the facility/operation, having one key, and for which master keys are not available. Such locks are individually assigned (personal lock) to Authorized Employees, or can be obtained from a central repository of LOTO devices, where upon they become personal locks while in use by an individual. LOTO Locks are typically colored red.

What is Individual LOTO Lock

200

An employee who operates equipment that is being maintained or serviced under EC/LOTO, or an employee working in an area where the maintenance or servicing is being performed. This could include machine operators, janitors or any other worker whose job requires him/her to be in the area. Affected Employees are NOT authorized to perform EC/LOTO.

What is Affected Employee

200

___________

•Can be found in machinery or equipment parts that might descend, slide or fall if left unblocked

__________

•Relating to or operated by electricity – AC or DC

What are Gravity & Electrical

200

Names these LOTO devices:

 

What are Plug lock & Gate Valve lock

200

Step 2  is Shut Down of the Equipment.

Involve the _______ who normally shuts down the equipment.

If the work is being performed at a customer site, the ________ should shut down the equipment.

worker

customer

300

LOTO does NOT apply to _____________.

What is single source plug and cord equipment when the equipment is unplugged and under exclusive control of the person performing the work.

300

Every employee who will be in ___________  __________ to any machinery or equipment being worked on will be affected by Lockout/Tagout.

close proximity

300

_____________

•Involving, moved or operated by a fluid under pressure, either internal or external

_____________

•May be in cylinders, lines and pipes

_____________

•Can be hot or cold

What are Hydraulic, Pneumatic, & Thermal

300

name this LOTO device:

What is Fuse cover

300

This step includes:  Remember to stand to one side when opening electrical disconnects in the event of electrical arc occurs.

What is Step 3 Isolate the Equipment

400

A key lock that is not assigned to an individual employee as an Individual LOTO Lock. This lock has only one key and master keys are not available. When a Group LOTO is used, this lock may be used to Lock Out individual Energy Isolating Devices or Energy Sources. This lock may be left on for durations of greater than one shift. This lock is unique within the facility and is to be used only for LOTO.

What is General LOTO Lock

400

_____________ ____________ is required when:

-There is a change in job assignment

-There is a change in energy control procedures

-Inspections indicate deviations in procedures

-Employer believes employee needs retraining

is required when:

-There is a change in job assignment

-There is a change in energy control procedures

-Inspections indicate deviations in procedures

-Employer believes employee needs retraining

What is Employee Retraining 

400

___________

-Produced as a result of a chemical reaction

___________

-Water vapor kept under pressure so as to supply energy for heating or mechanical work

What are Chemical & Steam

400

Name these LOTO devices:

 

What are Circuit Breaker cover & Wall Switch cover

400

Step 4 is titled _____________.

Step 5 describes ways to relieve or disconnect residual hazardous energy that include:_________, _______, ______,_______.

What is APPLY LOCK OUT/TAG OUT DEVICES

and

What is:

Bleed Off all trapped pressure

Blank pipe flanges

Install ground wires to discharge electrical capacitors

Block or support elevated equipment

500

Must be used whenever you are performing service or maintenance on any machine where you or someone else could be injured by the unexpected startup or release of stored energy

What is LOTO

500

________________ ___________  must:

-Recognize hazardous energy sources including type and magnitude present in the work place

-Know the methods and means to isolate and control hazardous energy sources

-Perform an annual demonstration to show they know how to properly apply LOTO

What is Authorized Employees

500

These isolate energy so that ____________ or __________ of _____________ energy:

-Circuit Breakers

-Disconnect Switches

-Line Valves

-Block Valves

-Manually Operated Switches

What is transmission or release of hazardous

500

Name these LOTO devices:

 

What are Group lockbox & Ball Valve locks

500

This step has the technician ____________/___________ using testing equipment like voltmeters, thermometers, manometers, etc....


Verify isolation/Zero Energy