500
- All personnel clear of equipment
- All work completed
- Obstructions, debris, tools have been cleared from the equipment
- All electrical components are enclosed or properly covered
- All guards, covers, and safety devices have been reinstalled
- All incidental/secondary utilities have been restored
- Remove locks, tags, and lockout devices
- Turn operation controls to the "on" position and verify proper operation of the system/equipment.
What is the procedure to release LOTO and return to normal operation?