Employee who work in an area, but are not trained in LOTO
What is an affected employee
The most common form of energy we need to lockout
What is electrical?
Placing a tag at the power source
What is Tagout
Office personnel
What is an other employee
Energy stored by air under pressure
What is pneumatic?
Person who has been trained in the procedure and performs LOTO
What is an authorized employee
Person who works in the area and is trained in LOTO
What is an authorized employee
Energy contained in a liquid under pressure
What is hydraulic?
Physically blocking a piece of equipment from all its power sources
What is Lockout
Maintenance employee completing electrical work on a machine.
Authorized.
Prepare for shutdown.Energy in its resting (stored) state
What is the first step in LOTO procedures?
"Distinctive, "durable", "key-operated", and "used for LOTO purposes only".
What is the four requirements of a lockout device?
Contractor completing electrical work on a new machine.
Authorized.
Verify the isolation of the machine or equipment.
What is the last step in LOTO procedures?
LOTO places a piece of equipment into this "state"
What is a "zero energy state"