the collection of activities involved in the orderly receipt of all materials coming into a facility.
What is receiving
100
Takes into account how much of any one kind of a material is retrieved for a shipment within a given time period.
What is known as Volume
100
The people who select, count and deliver merchandise (orders) to shipping.
Who are Order Pickers
100
Is made up of partially-finished goods between steps in the manufacturing process.
What is Work-in-Process (WIP)
100
what is known a substance or material that is capable of posing an unreasonable risk to health, safety and property when transported in commerce.
What is considered a (hazmat) Hazardous Material
200
this is used as a means for the shipper to obtain payment for the materials from the customer.
What is order bill of lading
200
Inventory of large numbers of unit loads of the same SKU or the same type of materials are usually stacked on the floor together.
What is bulk stacking
200
a picker assembles all the items for a group of orders.
What is Batch-Picking
200
Inventory management that involves total inventory movement rather then moving individual items.
What is Aggregate inventory management
200
In the element of training with Hazmat material this training is designed according to the specific task the employee will perform.
What is Function-specific training
300
location in a facility where materials are organized
What is the Staging area
300
this type of storage is used for storing materials such as lumber, steel sheets and rods and other long or unusually large items.
What is a Cantilever Rack
300
a system that uses a scanner to register whether the storage area chosen is correct for the item.
What is Put-to-light systems
300
The concept to produce precisely the necessary units in the necessary quantities at the necessary time.
What is know as (JIT) Just-in-Time inventory control
300
Hazmats are categorized into how many classes based on characteristics or specific hazards presented.
What is 9
400
an electronic data interchange (EDI) notification of shipment of product.
What is Advance ship notice
400
a type of powered storage device that either moves horizontally or vertically
What is a Carousel
400
action of pulling material for an order from the inventory before the material is required.
What is known as Staging
400
this is based on the principle that if you control the fastest moving and/or highest cost items,the slower moving, lower cost items will not have a significant impact.
What is ABC Inventory Control analysis
400
a shipper or transporter of hazmats that require placarding must register with who?
Who is the(USDOT) united states department of transportation.
500
an invoice presented by the carrier to the shipper, the consignee or a referenced third-party as a demand for payment for services rendered.
What is Carrier freight bill
500
This system has a operator who rides along with an order-picker and its load.
What is Man-on-Board AS/RS
500
the activity required to administratively process a customer's order and make it ready for shipment or production.
What is Order processing
500
An inventory accuracy audit technique where inventory is counted on a cyclic schedule rather than once a year.
What is known as Cycle count
500
This is based on the idea that every worker has the right to know the dangers of the materials they are exposed to at work.
What is the Right-to-Know Law (HAZCOM) or Hazard Communication