400
Name 5 of the many (there are at least 13) locations where pencil entries are authorized.
1. Monthly Flight Summary (the last entry prior to transfer)
2. Technical Directive "Status" block for TD's that are NINC or NIS
3. Technical Directive Page: When cancellation instructions in an interim TD indicate it will be superseded by a regular TD, the info for the TD will be made in pencil on the following line.
4. VFS CADPAD, TRACE CADPAD (Installed Explosive Device)- The ORG code may be in pencil
5. Parachute Record- The BUNO
6. Seat Survival Kit Record- The BUNO
7. AESR Cover- Replacement Due block
8. Module Service Record- Component/Assembly & Module Due blocks
9. Module Service Record- ENGINE/PROPULSION SYSTEM DUE. Entry not made until MSR is redesigned.
10. ASR-REPLACEMENT DUE, REPLACEMENT INTERVAL, and TIME REMAINING
11. Assembly Service Record-Block E - MISCELLANEOUS DATA
12. Equipment History Record- Block E - MAINTENANCE DUE.
13. Scheduled Removal Component Card- block D - REPLACEMENT INTERVAL & lock D - REPLACEMENT INTERVAL