Good Operators
LCS
Procedures
Process Safety
Random
100

Always has this on them

What is Thread tape

100

Definition of Hot Leo

What is 

A LEO for servicing and/or maintenance that is not isolated from an energy source according to IOES Standard


100

I am the definition of all procedures and how to use them and to make changes

What is the Procedure use policy

100

I open when the Reactor reaches 2517 KPA

What is the Fast Vent

100

I can read procedures in the dark

What is Dayo

200

I see the other lines lugger is full so I will

What is tell someone else to change it.


 JK ...... I will change it for them

200

Difference between Pressure Washing and Hydro blasting

What is    See Chart

200

I need to be with you at all times, and each step initialed as completed

What is a Critical Procedure

200

I will automatically shut when my DP reaches 35kpa

What is the Ethylene DV&V

200

I like to say Big Shoots and my favorite operator is D Bag

Who is Jamie Johnson

300

If someone's unit trips I will immediately...

What is go outside and support them, Help them, for god sakes anything but sit inside on your phone

300

Heavy Equipment definition

What is Large, heavy duty vehicles, specially designed for digging, lifting, or moving of             materials, usually involving construction, maintenance, agriculture or industrial sites.


300

Tools which ensure safe and reliable operations, capture and standardize best practices, and assist people in their work.

What is Operating Procedures

300

LOPA scenario on the PDS

What is G Line Temperatures

300

Who will be on vacation next week, Sept. 16 – Sept. 20.  We all got an email from this person!

Who is Haley Rae - Moir

400

Laura or Ai come into the control room so I....

What is Greet them with a Hello, take my feet off the table, put my phone down, etc

400

 Different types of Hydro blasting in order of preferred use (4 of them)

What is 

  1. Remotely controlled (In Situ) hydroblasting system (RCHS), or
  2. Fully automated remotely-controlled hydroblasting system, or
  3. Semi-automated remotely-controlled hydroblasting system, or
  4. Manual hydroblasting if approved by RCL, Business Manufactoring Technology Leader and the Industrial Cleaning Technical Solution Team


400

The temperature the Mixer, Hot Oil and Die Plate need to be to go for a start

What is 140 degrees

400

Name 10 Process Safety Commandments

What is .....


- Hydrocarbon releases to atmosphere MUST be avoided to prevent a vapor cloud fire or explosion.

 


- Hydrocarbon and air mixtures inside equipment MUST be avoided to prevent vessel rupture. 


- Ethylene over heating and/or rapid pressurization MUST be avoided to prevent decomposition. 


- Handle all alkyls as if pyrophoric and DO NOT allow them to mix with air or water and do not introduce alkyls into the flare header. 


- DO NOT operate outside the Product Purge Bin Operating Window. 


- Proper precautions MUST be used when working around systems or equipment that could potentially contain hot water.  DO NOT operate water systems hotter than is absolutely necessary for the operation.


- NEVER transfer solids with Minimum Ignition Energy (MIE) less than 10 milli-joules with air.


- Nitrogen is an asphyxiant and extreme caution MUST be used when working around equipment/areas where nitrogen may be present. 


- NEVER mechanically or thermally shock carbon steel equipment that has been cooled by depressuring ethylene or propylene.


- Adequately installed and sealed insulation MUST be in place in the purification areas where surface temperatures can reach or exceed the Auto Ignition Temperature (AIT) of flammable materials.


400

If the Permit desk guy calls you and says pipe fitteres are signed onto the tag where do you want to meet them, your response should be?

What is Can you send them out with the tag please, or I will be right in to grab the tag to verify the isolation is appropriate for the job scope.

500

On a day shift the MTL is heavy in another unit....

What is speak up at the morning meeting to offer your help to that operator, be prepared to grab their samples for them, read the play, etc

500

Definition of a Critical Lift

What is 

A lift that meets any of the following: 

  • The hoisted load exceeds 80% (US ONLY 75%) of the crane's maximum capacity load chart under lifting conditions
  • The load exceeds 50% of the crane's load chart under lifting conditions over power lines or process equipment
  • Lifts that involve 2 or more cranes 
  • Lifts that involve nonroutine or technically difficult rigging arrangements
  • A traveling crane with the load that poses a hazard or that exceeds 50% of the crane's load chart under lifting conditions
  • Lift of a worker(s)
  • Lifts in a congested area
  • Any lift which the Crane Operator determines is critical


500

Definition of High risk, (Critical OP)

  • What is
  • It may address a Life Critical Standard
  • It is required by law to sign it
  • It is part of a defined layer of protection that we take credit for (LPP, LOPA or MET)
500

TES Definition

What is Technical Engineering Support??

500

I am the largest mammal to ever lived  

What is An adult blue whale can grow to a massive 30m long and weigh more than 180,000kg - that's about the same as 40 elephants, 30 Tyrannosaurus Rex or 2,670 average-sized men. 

M
e
n