ROG
POG
HST
A/DACG
BOG
100

The main task of the ROG

What is loading and unloading military equipment onto railcars

100

POGs operate mainly in this type of environment

What is the seaport or commercial port facility

100

The primary mission of an HST

What is lifting and transporting cargo via helicopter using external loads

100

What does A/DACG stand for

Arrival/Departure Airfield Control Group

100

The primary mission of the BOG

What is to support the landing and movement of troops, equipment, and supplies across the beach

200

This is the first action in planning a railhead operation

What is conducting a rail reconnaissance and coordination

200

This is the primary responsibility of a POG

What is receiving, staging, and loading/unloading equipment and supplies at a port

200

This tool prevents electrocution when hooking a load

What is a static discharge wand

200

The primary task of an A/DACG

What is managing and coordinating inbound/outbound aircraft and cargo movement

200

This element of the BOG is responsible for organizing and controlling movement from the beach inland

What is the Shore Party

300

The minimum number of tie-down chains for a tactical vehicle

What is four

300

This document tracks inbound/outbound cargo at the port

What is a manifest

300

The billet responsible for directing the load under the aircraft

who is the inside director

300

This person controls the movement of vehicles on the flight line

Who is the marshalling NCO or airfield control personnel

300

This is established by the BOG to manage incoming supplies and equipment 

What is the Beach Support Area (BSA)

400

This individual approves the train for departure

Who is the Railhead NCOIC or safety officer

400

This person works directly with the shipping line

Who is the Port Liaison Officer or POG OIC

400

The standard sling set weights used by HSTs

What are 10,000 lb and 25,000 lb sling sets

400

A/DACG teams operate in this kind of location

What is an airfield or expeditionary landing zone 

400

These two main functions are performed by the Shore Party at the beachhead.

What are Beach Traffic Control and Logistical Support

500

This document outlines specific placement and securing for each vehicle

What is the Load Plan

500

One challenge unique to port operations

What is tides, congestion, o customs clearance delays

500

What are the chain counts for a M149 Waterbull using a dual point sling set

20 in the front, 3 in the rear

500

This document is used to validate aircraft cargo and passengers

What is a DD Form 2131 (passenger manifest) or cargo manifest

500

This coordination center is set up by the BOG to management all landing support operations at the beach.

What is the Beach Operations Center (BOC)

M
e
n
u