Components
Components 2
Operations
Maintain
Procedures/Install
100

Name the two accumulators

1. Pressure Roller

2. Friction Brake

100

What type of fuel goes in the M-31's? 

Diesel

100

What is the first step when turning the gear on?

(make sure clutch is disengaged)

Plug in the battery

100

When are pre-ops conducted on the gear?

Before operations or 4 days with no ops.

100

What is the purpose of hand and Arm signals?

Non-Verbal Communication

200

What are the dimensions of the purchase tape?

-Long      -Wide-      Thickness 

Long= 894 ft

Wide= 10 in

Thickness= .300in

200

The Hydraulic Control Panel is apart of witch Installation?

Electrical Installation

200

What is the hand and arm signal for 300 PSI?

Motivate me

200

Which direction does the turn buckle face when connected to the gear?

U.S. faces the gear

200

How many outriggers on Routine? Concrete?

Routine is 7

Concrete is 5

300

What are the two parts of the arresting gear assembly?

1. Energy Absorber Assy

2. Brake Clutch and Bearing Assy

300

What are the three parts of the power unit assembly?

1. Diesel Engine

2. Fluid Coupling

3. PTO Clutch

300

What do you look at before giving the 500 or 300 PSI hand and arm signal?

Brake Clutch Gauge

300

How long do you warm up the gear for?

Two Minutes 

300

What needs to be on before lowering the trailer?

The Hydraulic system

400

What are the 8 Components of the Hydraulic Installation?

1. Reservoir

2. Thermo Switch

3. Oil Cooler

4. Hydraulic Filter and Gauge

5. Accumulators

6. Cooling system motor

7. Main Control Manifold

8. Hoses and Fittings

400

What are the 8 parts of the basic trailer sub assembly?

1. Running Gear Assembly

2. Hydraulic and Parking Break Assembly

3. Mobility Cylinder

4. Front Sheave Assy

5. Rear Sheave Assy 

6. Absorber Sheave Assy 

7. Trailer Platform

8. Pintal Assy

400

What is the proper hand and arm signal for cinch?

BOOM

400

What is the MIP?

Maintenance Index Page

400

What tool do you use to position the trailers?

Rings and Strings

500

Name the 10 components of the Cooling installation?

1. Radiator

2. Water Pump

3. Expansion Tank

4. Radiator pressure cap

5. Check Valve

6. Automatic 3 Way Valve

7. Drain Valve

8. Y-Strainer

9. Cooooooolant

10. Temp Sensor and Thermometer

500

Name the 10 parts to the basic trailer assembly?

1. Pressure Roller Installation

2. Pendent Reel Assy

3. Worm Gear Assy 

4. Multi Banded V-Belt

5. Roller Chain

6. Quadrant Control Assy

7. Engine Feed And Return Hoses

8. Brake Manifold Assy

9. Stabilizer Ring Assy  

10. Energy Absorber Roller Assy

500

What two switches need to be engaged to turn the gear on after the Main power switch is on?

1. Ignition Switch

2. Oil Pressure Bypass

500

What is the cooooolant mixture of water and Ethylene Glycol?

40% Water 60% Glycol

500

What is the turnbuckle (1 by 12) opened to?

The one that attaches to the template.

61 inches

M
e
n
u