Procedure Overview and Responsibilities
Pre-Start Inspections and Maintenance
100

Responsible for reviewing completed Pre-Start Inspection checklists to ensure they are correct and complete.

Who is the operations supervisor/manager?

100

This form identifies any issues or concerns with the equipment before use.

What is a Pre-Start Inspection checklist?

200

Responsible for ensuring that Pre-Start Inspection checklists are completed.

Who are the Vehicle/Equipment Operators.

200

Should be done if a safety issue is identified during a Pre-Start Inspection

What is tag it out of service?

300

Responsible for reviewing and approving modifications to equipment or systems

Who is the engineering department?

300

Some equipment tallies the total number of ______ rather than miles.

What are hours?

400

Responsible for developing the asset list.

Who is the maintenance manager?

400

Software system used to document maintenance work orders.

What is MaintainX?

500

Establishing guidelines for maintaining WCS mechanical and electrical systems, rail and building structures, equipment, and vehicles.

What is the primary purpose of this procedure?

500
This person enters information into MaintainX.

The planner/scheduler.