Design & Implementation
IUC/INF
Operating Effectiveness
100

What is Design Factor 5?

Threshold for Investigation

100

What is the difference between IUC and IPE in the point of view as an auditor?

Information that is used by auditors Vs. the entity for the control.

100

If a control's design is deficient, do you perform OE testing? 

No

200

What Audit Procedure are you NOT permitted to use alone for Testing?

Inquiry!

200

What does Object of Review mean? 

Information where the Control covers Accuracy and Completeness

200

How many months can a control can be rolled forward as per the guidance?

3-4 Months

300

What is the difference between Inspection and Observation? 

Verifying "Information" vs Processes 

300

Explain the Testing Process of System Generated Listings of an IUC.

SAP to Listing and Listing to SAP

300

What is your next step when you identify a deficiency in a control? 

Document in Evaluation of Deficiencies

400

What are examples of common pitfalls in the design factors?

Various

400

What is the difference in extent of testing for IPE with IT reliance vs non-reliance? 

One sample for Reliance and # of Substantive Sample for Non-Reliance

400

What is the difference between Apportion and Rollforward?

Timing and Allocation of Testing

500

What is the difference between Inspection and Reperformance?

Inspection-Evidence we see

Reperformance-Doing it Ourselves

500

What's NEW for OPEX.01 and OPEX.02 testing?

Disbursement Listing to PR/PO Listing and AP Credits Listing

500

Name three factors that affect RAWC.

Various.

M
e
n
u