100

This project, under construction in Wellington, included the construction of a 7 foot deep competition pool, as well as a 10,000 SF pool house and is currently set to finish construction in October.

VOW Aquatics Facility

100

RFQ

Request for Qualification

100

CSC

Continuing Service Contracts

100

The leads working together to assemble a response to a request for proposal

Marketing Lead and Main Lead

100

Tracks proposal stages include submitted, shortlist, awaiting response, presentation, post-proposal

Proposal workload board

200

This project done for the Seminole Tribe of Florida took three phases to fully complete which included 4,000 linear feet of 24" force main through residential neighborhoods and underneath the Florida Turnpike. This project is featured on the WS Open Asset home page!

Hollywood WWTP

200

PX

Project Executive

200

PDB

Progressive Design-Build 

200

The people presenting to the owner’s selection committee on the information requested or included in the proposal.

Presentation Team

200

The year Becky started at Wharton-Smith

2015

300

This Design-Build job is a new 27,000 SF building in Vero Beach and recently celebrated its Groundbreaking Event.

Sheriff's Office Administrative Service Complex

300

PS

Pump Station

300

CMAR

Construction Management At Risk

300

Reviews the final draft for accuracy, spelling, Grammar, and makes sure a response minimum requirements are met.

White Glove Reviewer

300

The win rate of proposals submitted (does not include any that did not materialize) in 2024

49%

400

This WTP is currently under the leadership of John French, working with Hazen & Sawyer, and is set to complete in 2029 with a budget north of $250 million.

Howard F. Curren AWTP Master Plan Improvements Phase I

400

RO

Reverse Osmosis

400

AECOM

Architecture, Engineering, Construction, Operations, and Management

400

Reviews our litigation response when a proposal request requires it.

Wharton-Smith’s Contracts Team

400

The number of presentations given in 2024

50

500

This 14,000 SF pre-engineered metal building was built for Lake County Schools in 2019.

Cypress Ridge Elementary School Cafetorium

500

DNB

Dunn and Bradstreet Number

500

WCDA

Water Collaborative Delivery Association

500

Review of the layout, story flow, and response layout, the proposal is around 45% complete at this stage.

Pink Team Review

500

The number of Marcomm team members involved in crafting a winning team

All of us

M
e
n
u