This project, under construction in Wellington, included the construction of a 7 foot deep competition pool, as well as a 10,000 SF pool house and is currently set to finish construction in October.
VOW Aquatics Facility
RFQ
Request for Qualification
CSC
Continuing Service Contracts
The leads working together to assemble a response to a request for proposal
Marketing Lead and Main Lead
Tracks proposal stages include submitted, shortlist, awaiting response, presentation, post-proposal
Proposal workload board
This project done for the Seminole Tribe of Florida took three phases to fully complete which included 4,000 linear feet of 24" force main through residential neighborhoods and underneath the Florida Turnpike. This project is featured on the WS Open Asset home page!
Hollywood WWTP
PX
Project Executive
PDB
Progressive Design-Build
The people presenting to the owner’s selection committee on the information requested or included in the proposal.
Presentation Team
The year Becky started at Wharton-Smith
2015
This Design-Build job is a new 27,000 SF building in Vero Beach and recently celebrated its Groundbreaking Event.
Sheriff's Office Administrative Service Complex
PS
Pump Station
CMAR
Construction Management At Risk
Reviews the final draft for accuracy, spelling, Grammar, and makes sure a response minimum requirements are met.
White Glove Reviewer
The win rate of proposals submitted (does not include any that did not materialize) in 2024
49%
This WTP is currently under the leadership of John French, working with Hazen & Sawyer, and is set to complete in 2029 with a budget north of $250 million.
Howard F. Curren AWTP Master Plan Improvements Phase I
RO
Reverse Osmosis
AECOM
Architecture, Engineering, Construction, Operations, and Management
Reviews our litigation response when a proposal request requires it.
Wharton-Smith’s Contracts Team
The number of presentations given in 2024
50
This 14,000 SF pre-engineered metal building was built for Lake County Schools in 2019.
Cypress Ridge Elementary School Cafetorium
DNB
Dunn and Bradstreet Number
WCDA
Water Collaborative Delivery Association
Review of the layout, story flow, and response layout, the proposal is around 45% complete at this stage.
Pink Team Review
The number of Marcomm team members involved in crafting a winning team
All of us