What does an exclamation point/caution symbol represent in MF12?
Parts went COGI during that step of reporting
COGI occurs when components are consumed in High Volume Back Flush (HVBF) when we do not show systematic inventory.
What is a 0002 and 0007 trigger?
Operator Fire and MC Fire
What is LS24 used for?
•Used to find a stock location for parts at the warehouse
i.e. Repack, 999Submit, Blu Resolve, Q Hold, NILS, etc.
What kind of machines do all the prefixes of sequence numbers associate with? (221,227, etc)
221 - Large Line Moline Machines
222 - Small Line Machines
227 - John Deere Paton
228 - Orthman
223 - PUKs
What is a "915" operation code in ZCWIP and MF12?
West loop unhang.
Give an example of what could cause COGI.
Inaccurate inventory, BOM errors, overconsumption, missing independent requirements, lacking knowledge of ECM changes, etc.
What is Rip Max?
The calculated quantity of inventory your department uses in 2.75 days. When inventory equals your Rip Max, an automatic TO is generated to be filled by the warehouse and sent to the factory.
What does "902" stand for in a TO?
The part needs stored at the warehouse before it can be picked
What movement code is used to rebrand a part? What movement code is used to move parts from one department to another systematically? What transaction is used to make these moves?
309, 311, and MB1B
Identify what A001, S001 and I001 means?
A001- production, S001- service, I001- interfactory
What happens if I don't clear my COGI?
Inaccurate inventory, Sequence impact inaccuracy, inaccurate need dates
What is the most recent column addition to the critical report?
Last write on/ write off adjustment date
What is NILS?
Not in location... contact Mitch, Kelli (1st), or Kevin (3rd) immediately to confirm if material is truly missing. Deceiving as material still shows in 013 inventory until resolved.
What does MAPOU stand for?
Material Availability at Point Of Use
What's the difference between discrete and repetitive reporting?
Repetitive reporting is done for weldments in smaller quantities/batches.
Discreet reporting is by sequence.
Identify one way to clear COGI.
311 move material from one work center to another, rebrand, adjust on inventory.
What is an M09 MRP Group?
Manufactured material relevant to ZCR2.
What does LT24 show us?
Both open Transfer Orders (TO’s) status and history of confirmed TO’s
What are the core values of John Deere?
Quality
Commitment
Integrity
Innovation
Provide 1 work center example for both repetitive and discrete reporting.
Repetitive: W0592, W0595, W0596, W0597
Discrete: W0523, W0532, W0545, W0571
What is COGI an acronym for?
Consumption of Goods Issue
How many times/day does the CSR refresh on PowerBI?
6 times. 1a, 4a, 7a, 10a, 6:30p, 10p
Will take 7. 6a is another time but not on the CSR Instructions.
What does a yellow triangle with a green equal sign signify?
TO has been picked at the warehouse and the physical quantity reflects that of the systematic TO
"Nothing Runs Like A Deere" you've seen it, you've heard it... what Deere product was being marketed with this slogan when it stuck and became well known worldwide?
The popular slogan "Nothing Runs Like a Deere", was first used to promote the snowmobile line in 1972. Crazy right?!