OSHA
FIRST AID/CPR
BLUEPRINTS
TOOLS/MATERIAL
CONSTRUCTION MATH
100

WHEN WAS OSHA CREATED

WHAT IS 1970

100

WHAT IS THE BEST WAY TO STOP BLEEDING

WHAT IS DIRECT PRESSURE

100

PRINT READING REQUIRES WHAT TWO KEY ELEMENTS?

WHAT IS VISUALIZATION & INTERPRETATION 

100

CORRECT TERM TO FOR SKIL SAW

WHAT IS CIRCULAR SAW

100

length x width gives you

what is AREA

200

OSHA IS AN ACRONYM FOR

WHAT IS OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

200

THE ACRONYM CPR STANDS FOR? 

WHAT IS CARDIO PULMONARY RESUSCITATION
200

 A.S.M.E.P IS AN ACRONYM WHICH STANDS FOR 

WHAT IS:

- ARCHITECTURAL

- STRUCTURAL 

-MECHANICAL

- ELECTRICAL

- PLUMBING

200

IF THE LUMBER HAS A NOMINAL SIZE OF 6" X 6", THIS MEANS THE ACTUAL SIZE IS ?

WHAT IS 51/2" X 51/2"

200

length x width x height gives you 

what is volume

300

WHICH OF THE SIX TYPES OF INSPECTIONS IS OSHA'S TOP PRIORITY.

WHAT IS IMMENENT DANGER

300
WHAT IS THE MEANING OF THIS ACRONYM. AED

WHAT IS AUTOMATED EXTERNAL DEFIBRILLATOR

300

THIS PRINT IS THE MOST LOOKED AT THROUGH OUT THE BUILDING TRADES

WHAT IS FLOOR PLAN

300

THIS TOOL IS USED IN NARROW TRENCHES TO COMPACT THE EARTH OR AGGREGATE BASE

WHAT IS JUMPING JACK

300

what  is the formula needed to caluculate concrete yardage

what is length x width x height divided by 27

400

IN 1970 TWO GOVERNMENT AGENCIES WERE ENACTED, ONE WAS OSHA AND THE OTHER?

WHAT IS NIOSH

400

WHAT IS THE  PHRASE USED TO DESCRIBE THE POSTION FOR SOMEONE WHO IS BREATHING AND UNRESPONSIVE.

RECOVERY POSITION

400

THIS PRINT GIVES YOU THE VIEW/ PERSPECTIVE AT EYE LEVEL.

WHAT IS ELEVATIONS.

400

IF THE NOMINAL SIZE, IS 2X4 ...WHAT WOULD BE THE ACTUAL SIZE.

WHAT IS 11/2 X 31/2

400

what is 3 inches converted to decimal.

what is .25

500

DURING AN OSHA JOBSITE INSPECTION... WHAT ARE THE FOUR PARTS OF THE INSPECTION?

WHAT IS PRESENT CREDENTIALS, OPENING CONFERENCE, WALK AROUND, AND CLOSING CONFERENCE.

500

WHILE GIVING CPR TO A VICTIM, THE RESCUER WILL STOP PERFORMING CPR UNDER WHAT THREE CONDITIONS

WHAT IS PERSON WAKES UP, EMERGENCY PERSONNEL ARRIVES OR AN AED TELLS YOU TO

500

THESE TYPES OF LINES ARE MADE UP OF MEDIUM WEIGHT, EVENLY SPACED, SHORT DASHES.

WHAT IS HIDDEN LINES.

500

when selectiing lumber to form a concrete slab. what are two things your looking for in the lumber.

what is the bow and crown.

500

what is the total yardage needed for a slab 20feet by 20feet by 3inches thick. (round to nearest tenth and hundreth if necessary)

what is 3.70 yards