Concrete Basics
Concrete Takeoff
Concrete Estimating
Concrete Tools & Equipment
Concrete Safety & Best Practices
100

ACI stands for (Blank)

The American Concrete Institute 

100

What's the first step before doing a take-off?

Verify Scale

100

This is the standard waste factor percentage added to concrete takeoffs.

5%-10%

100

This hand tool is used to level freshly poured concrete.

Screed

100

This protective gear must be worn to protect your eyes from splashes.

Safety glasses

200

A standard ready-mix concrete truck in the U.S. usually carries (Blank) amount of concrete.

8-10 CY/ Truck

200

To calculate cubic yards, you multiply length x width x depth and then divide by this number.

27

200

Rebar is usually estimated and priced at what unit of weight?

Pounds or Tons 

200

A bull float is used for this purpose.

Smoothing/Leveling the surface

200

OSHA requires fall protection for concrete work at this height.

6 Feet 

300

Concrete Strength is measured in this unit.

PSI (pounds per square inch)

300

The total cubic yards for 200 LF of grade beam, 2' wide and 2' deep. (Use Waste Factor & Round up)

33 Cubic Yards 

300

In estimating, this percentage is often added to cover unexpected costs.

Contingency 

300

This machine is used for finishing (large) slabs. 

Riding Trowel or Power Trowel

300

Fresh concrete can cause this type of skin injury if proper PPE isn't worn. 

Chemical Burns

400

The temperature at which fresh concrete is considered "Hot weather concrete" per ACI standards.

90 degrees F (32 degrees C) 

400

If you have a 20' x 30' slab that is 6" thick, how many cubic yards are in that slab (Rounded up)

12 Cubic Yards

400

Labor costs for concrete are usually estimated by this measurement.

Square foot or Cubic Yard

400

This machine uses vibration to remove air pockets from fresh concrete.

Concrete Vibrator 

400

Before entering a trench for footing work, OSHA requires this type of safety system to prevent cave-ins.

S.S.S. (Shoring, Shielding, or Sloping)

500

The reason concrete is reinforced with steel: 

Concrete is strong in (Blank) stress but weak in (Blank) stress.

Concrete is strong in (Compression) stress but weak in (Tension) stress.

500

To convert cubic yards of concrete to 60 Ib bags, multiply by this factor.

45 bags per cubic yard

500

A pier is 24" in diameter and 18' deep. How many cubic Yards of concrete are needed to fill one pier? (Exact Cubic Yardage)

2.097

500

This finishing attachment is added to a power trowel to create a harder, denser surface on concrete slabs.

Pans 

500

When Operating a concrete pump truck near overhead power lines, the minimum clearance required is this many feet from the lines up to 50 kv.

10 feet 