What are the 3 Standard Safe Distance Requirements for PIT operators? (PIT/PIT, PIT/PED and evaluated PIT)
What is
PIT/PIT = 20 + feet
PIT/PED = 8+ feet from all pedestrians (unless protected by an approved safety barrier)
Elevated Loads (>4 feet) = 20+ feet from all pedestrians.
What is the required pallet staging distance (in inches) between conveyor and pallets?
min. 39" - max 55"
This color vest must be worn when entering a trailer
What is an Orange/High-Visibility Reflective vests
Number of exit routes required from work areas
What is 2 (minimum)
The maximum weight one person should lift alone?
What is 49 lbs.
What are the lights called that provide visual indicators of safe distance for PIT operators?
What are Blue Lights
Location where you find your emergency assembly point
What is the site map/emergency evacuation map
You need these when working with chemicals according to the SDS
What are chemical-resistant gloves and safety goggles
What is the name of the Safety tool you can use in your A to Z to report safety concerns?
Dragonfly
This color represents the ergonomic risk level 'High'"
What is Red
When must the PIT operator engage the wire guidance?
What is the yellow line on the PIT platform crosses the 5s yellow PIT line.
What does OSVR stand for
What is Operational Variance Safety Response. It is a tool used at Amazon to address safety concerns during operational changes or variances.
When working working at heights above 4 feet, this must be worn
What is a full body harness/fall protection
Color of LOTO locks used for electrical energy
What is Red
Number of ergonomics breaks required per shift
What is 2? (besides regular breaks)
How long does an PIT operator have to complete the NOBA following the PIT Practical Evaluation?
What is no more than 7 days.
This daily inspection must be completed by Leadership
What is a GEMBA Walk/Safety Walk
The minimum ASN rating required for safety shoes at Amazon
What is ASN F2513-18 with minimum impact resistance of 75 lbs.
The safety metric tracking injuries per 200,000 hours worked
What is OSHA Recordable Incident Rate/TRIR
The proper height range for working surface in pack.
What is between knuckle and elbow height
When is it safe to pass another PIT?
What is there's no passing unless the PIT ahead is fully stopped and acknowledges
This meeting must be completed at the start of every shift
What is Start Up/Stand Up Meeting
What PPE is required with using RFI scanner
What is a scanner harness or holster
What does 5S stand for?
Sort
Set in Order
Shine
Standardize
Sustain
Maximum height for manual stacking of boxes
What is 6 feet.