Mechanical Details
Electrical Details
Safety
Holder Culture
100

A mechanical cooling device that sits on the top of a building's roof.

What is a RTU (Rooftop Unit)?

100

A list of the lighting fixtures to be used on a project.

What is a lighting schedule?

100

This is a type of PPE that sits on top of your head.

What is a Hard Hat?

100

This person is someone you should have periodic conversations with regarding your performance, evolvement, strengths, and areas for improvement.

Who is a development partner?

200

A type of valve that only allows flow in one direction.

What is a check valve?

200

This is an undergorund electrical circuit.

What is Ductbank?

200

This is a required session for any person to perform work on a Holder job site.

What is Holder Safety Orientation Training?

200

This is a symbol earmarking your first anniversary with the company.

What is a "Holder Boulder"?

300

A person that installs sanitary and waste water lines in a building.

What is a plumber?

300

This is a system that monitors the electrical flow of power in a building. (Typically data centers)

What is an EPMS (Electrical Power Monitoring System)?

300

This person is responsible for giving feedback to an operator of a piece of equipment while the equipment is in use.

What is a spotter?

300

This is the name of a behavioral test widely encouraged to be used by Holder associates to understand how yourself and others work.

What is DiSC (DiSC profile/survey)?

400

A device that cools water by means of compression.

What is a chiller?

400

This is a means to safely secure a live electrical device.

What is a LOTO (Lock Out Tag out) Procedure?

400

This is a document that list information relating to occupational safety and health for the use of various substances and products.

What is a MSDS (Material Safety Data Sheet)?

400

This two-word phrase commonly used by Holder leadership and other associates illustrates the cohesiveness of all Holder offices and people around the country.

What is "One Company"?

500

This is the method to determine that each part of a building is getting the required air circulation per the specification.

What is Test and Balance?

500

A study to evaluate the safety of a circuit to determine hazards and risks in relation to electrical systems.

What is an Arc Flash Study?

500

This has to be filled out for every lifting activity performed onsite by a crane.

What is an Exhibit T?

500

"Lead with Integrity"

"Perform Together"

"Develop Each Other"

"Improve Relentlessly"

This one is missing...

What is "Care and Connect"?