Traffic Control
Traffic Flow
Roadway Design
Signals
Signs & Markings
100

The device that assigns right-of-way at an intersection using red, yellow, and green indications.

What is a traffic signal?


100

The term for the number of vehicles passing a point per unit of time.

What is traffic flow/volume?

100

This part of the roadway is intended for vehicle travel.

What is a travel lane?

100

This color indicates that drivers must stop.

What is red?

100

This color separates opposing streams of traffic.

What is yellow?

200

The type of intersection control requiring drivers to stop on all approaches.

What is all way stop control (AWSC)?

200

The number of vehicles occupying a unit length of roadway.

What is density?

200

This feature is the raised or painted area separating opposing traffic streams.

What is a median?

200

This signal indication warns that the green phase is ending. 

What is yellow/amber?

200

This pavement marking indicates where a vehicle must come to a complete stop at a controlled roadway segment.

What is a stop bar/line?

300

The term for an area where two traffic streams merge, diverge, or cross.

What is a conflict point?

300

This is the equation representing the fundamental relationship among flow, speed, and density.

What is the equation q = uk ?

300

This roadway feature provides a gradual transition in elevation.

What is a vertical curve?

300

This term describes the inefficiency of vehicle movements as signal phases change.

What is lost time?

300

The full title of the document detailing standards for traffic control devices across the US.

What is the Manual on Uniform Traffic Control Devices?

400

A type of control adjusts signal timing in response to traffic conditions, typically via a loop detector.

What is actuated signal control?


400

This term is the maximum sustainable flow rate under specified roadway and traffic conditions. 

What is capacity?

400

This technical term represents the banking of a roadway on a horizontal curve.

What is superelevation?

400

The technical term for a signal phase timing plan when a movement is permitted.

What is the green interval?

400

This pattern, typically found painted in white on British roads, are used to indicate pedestrian crossings and prohibit parking and overtaking.

What is a zigzag pattern?

500

This is the term for the point where vehicles must choose between competing paths through an intersection.

What is a decision point?

500

This term describes the traffic-flow condition that occurs when demand exceeds the available capacity.

What is oversaturation/what is oversaturated flow?

500

These two types of speed are used to guide roadway design.

What are design and target speeds?

500

This time, in seconds, is the absolute minimum green interval time dedicated to pedestrain crossing, according to the MUTCD. 

What is 7 seconds?

500

One of two colors not in use by the MUTCD, and specifically stated as "reserved for future use."

What is coral/light blue?

M
e
n
u