On the Honeywell computer, forcing off 11A and 11B circulator will cause this to occur
close the respective NRW outfall valve.
Prior to entry into the OWS containment chamber, this must first be obtained
a Confined space permit
________ is only injected into the feedwater system when in mode 1
PAA
The maximum TRC concentration in the service water system is
2 ppm
Moving from north to south the 3rd candy can at the NRW basin is from this input.
the chem waste tank
With a discharge pH of 12.4 the NRW system will
continue discharging
The GWRS removes tritium from shallow ground water by these processes
Attrition (by pumping the wells allowing new water to flow in) and by radioactive decay
________ is injected into the steam generators to scavenge oxygen at low temperature
Carbohydrazide
When in upfront mode the chlorine pump pressure is expected to be around
50 PSIG
the condensate system ends and the feedwater system begins at this part of this component
Suction side of the SG feedpumps
In the clarifiers, 1 foot of level = this many gallons
38,000
The OWS lift pumps are rated at this capacity
4000 gallons per min.
the aux chem metering pumps are rated at this capacity
12 GPH ea.
If a Circ water TRC analyzers detects a chlorine value of 0.3 ppm this will occur
hi circ water TRC alarm
The NUC header chlorine analyzers are this type
carbon based by-peddle tools
When lined up in Att. #2 the mix tank Hi-Hi alarm will trip out these pumps
#2 clearwell pumps. #3 and 4
This GWRS component can cause the GWRS system pumps to trip if it goes into high level alarm
the GWRS building sump
This chemical is injected into the condensate system to control pH and reduce iron transport from wetted areas in the FW heaters and MSRs
ETA
These valves are designed to automatically isolate up front chlorination in its respective bay
SW32s
The heater drain pumps account for ____ of the total condensate system flow
33% or 1/3
This basin input is automatically redirected the the basin by a high conductivity alarm
waste recovery
OWS alarms and lift chamber level can be monitored here
The Scada panel
When injecting chemicals into the condensate system at the discharge of the condensate pumps, what position should the CN108 valves be in?
Open. to Bypass the condensate polisher
Service water chlorination was initiated at PSEG Nuclear after receiving this letter
NRC generic letter 89-13
When heating up the plant for start up Mode 3 is achieved when RCS Tave is
> or = 350 deg F