Grading and Pitch Information
Construction Details
Site Management
DHS
Misc.
100

What is the proper pitch for grading and drainage swales?

1/4" per a foot minimum 

100

What is the proper depth for footers when building a deck in DE?

32"

100

How do you limit site disturbance? 

layout work zone

100

What debris can't you dump at DHS?

leaves

100

Where do you place return items for the cage?

Red bin/cart

200

How many downspouts can you connect into one PVC line 40' or less?

Two

200

What is the proper depth for footers when building a deck in PA?

36"

200

How do you layout your work zone?

using Silt fence or construction fence or tree stakes with caution tape

200

what do you have to do to get loaded at DHS

fill out clip board and get ticket

200

Where do you return unused plants?

red metal tray

300

Should you use a T connection or a Y connection to tie 2 downspouts together?

300

What is the maximum allowable height for a step riser?

7 3/4"

300

What should you check prior to starting excavation?

utility markings

300

Where is DiSabatino's overstock?

behind the shed/barn
300

What is the largest piece of equipment you can trailer without a class A CDL?

cat mini ex (13)

RC or RT 50 (16 or 10)

400

How wide is a typical drainage zone?

24"

400

What's the maximum allowable height of a deck before you need a handrail?

30"

400

What should you do before you leave the jobsite at the end of the day to protect clients?

construction fence or caution tape or cones

400

When should you schedule your deliveries?

2 days prior

400

Where and how do you put back the attachments when you are finished with them? 

Back left corner of yard on pallets

NOT in front of trailers please

500

What is the maximum distance you can discharge a downspout from the front of a house in NCC?

20'

500

How many steps are you allowed to have before you need a stair railing?

2 steps 

500

What do you do to protect around large specimen trees from damage?

wood chips or mats plus construction fence

500

When calling off machines what is expected when the driver arrives to pick the machine up? (3 part answer)

1. Machine should be parked where it was delivered 

2. All attachments should be with the machine

3. Cones should be around the machine and attachments. 

500

What is the best practice to protect your job site in the cold weather? (2 part answer)

concrete blankets with poly on top

M
e
n
u