This is the minimum requirement for PPE while working on a customer's location.
What are Coveralls, Steel toe boots, impact gloves, Hard hat, and Spoggles.
This is the cementing PSL's Value Proposition
Design, deliver, and validate sustainable barriers tailored to minimize risk and maximize production.
Daily Double:
Explain/Elaborate on what this means and who is responsible for each; Design, Deliver and Validate
This is the document that is put together by the engineers that includes wellbore diagram, pumping procedure, anticipated pressures, and all other relevant information needed to execute a successful job from a job design standpoint.
What is the Job Program?
These are the steps one would need to follow in order to navigate to the SDS for a specific Material.
Employee will explain and walk me through the steps needed to navigate to an SDS.
Daily Double. Identify the PPE required for Musol A Solvent (2-minute time limit)
Was able to Navigate to Musol A Solvent SDS and identify PPE Required for handling
This is the application that is used to rapidly communicate issues or learnings from one area to the rest of the areas so that others can learn from the incident and can prevent us as an organization from making the same mistake twice.
What is the Lessons Learned Application on Appian
This is the process that needs to be followed if there is a need to make a change to the job procedure or deviate from the work instructions that were captured in the control points.
What is inform supervisor/service leader and initiate a Management of Change (MOC)
Must provide an example of a time that you have utilized stop work or been involved in a Work. Also explain how management responded and was the stop work supported by supervisor/service leader.
Describe a time that you utilized SWA or were involved in SWA.
These are ways in which our success is measured in regard to determining a successful or unsuccessful cement job. Looking for at least 5 indicators
Key Performance Indicators, Safety on location, Cement or Spacer Returns (TOC), Plug Landed, were there returns through the job, actual density of the slurry pumped compared to design, no equipment issues.
These are the processes/actions that are followed to verify equipment and materials are correct and ready for use prior to a job. Must be able to explain 5 checks.
Daily Double:
Navigate to either of the equipment/material/function test work methods or forms.
What is the 401, function test, verifiy cement is accounted for by checking packet/tags/silos/quantities/equipment numbers/Control Points, Scale/Gauge Calibrations
FO-GL-HAL-CMT-401
FO-GL-HAL-CMT-LND-0501
These are the most common risks associated with the jobs/tasks that we perform. Must name 7
Driving, Pressure (high and low), Red zones, Life Rules, Dropped objects, chemical exposure, pinch points, moving/rotating equipment, Simops, Weather, Suspended loads
Daily Double;
What are the 5 Critical Focus Areas
This is how the supervisor ensures that the operations plan is in line with the DOS and that they have the most recent work instructions for the job at hand. Who is responsible for each? step?
What is control point verification.
These are the periodic verifications that are completed to assure that we are following processes and are in compliance with all regulations and OSHA requirements.
What are Tier Inspections?
Daily double;
What are the different levels of tiered inspections and who is responsible for completing them?
These are the tools that help us to stay engaged in Halliburton's Left of Zero culture as well as keeping us actively looking for ways to improve upon safety or service quality performance. Must name at least 3.
Observations, SWA, safety blitz/region campaigns, A3 Teams, Control Points
This is the operational lab test that should be run on the cement slurries to assure a successful job is achievable.
What is the thickening time test.
Daily Double;
What is the lab equipment called that performs this test, What does Halliburton consider unpumpable, and what are the units of measurement that are used?
This is the minimum rat hole requirement for a cement job pumped on land and where we can find the minimum rathole length needed for a specific job.
The rat hole length should be determined for each job based on casing stretch for the given job and specific fluid weights and casing. A minimum of 10 ft safety factor should be used in addition to the recommended length.