Step 2
Reinspections
SCOPES
GAF
Contracts
100

How early should you arrive to an adj appt?

30 minutes early

100

When a HO says their claim got denied, what's the first thing needed before we proceed?

Denial Reasoning and/or denial letter/scope

100

What is non-recoverable depreciation?

Portion of insurance proceeds a HO will not receive due to policy

100

What are the two lines we typically present?

NS and HDZ

100

What is needed when going to a contract appointment?

pre filled contract papers, yard sign, receipt book, shingle samples, scope of work

200

How often should adj complete column be called for updates?

Every three days 

200

If the denial reasoning was due to insurance not being able to find a storm report to support the damages and DOL we provided, what do we do next?

Provide evidence/proof of the DOL we provided. (storm report)

200

Can an ACV scope have recoverable depreciation?

YES

200

What impact score does HDZ have?

3

200

What type of underlayment do we use?

Synthetic Underlayment

300

When an adj appointment is completed, what are the next admin steps?

Move job to adj complete status and update notes on how adj appt went and update HO 

300

If denial reasoning was due to the DOL falling outside of the HO's policy timeline, what do we do next?

Confirm they have the DOL we provided, see if we can change the DOL, get HO's prev. insurance info

300

How can you tell if a scope of work is RPS

have to look at payment page

300

What are the two main designer lines we provide?

Grand Sequoia and Camelot II

300

HO asks why we install ridge vents and won't just replace the box vents

Ridge vents provide more surface area for heat to exit the attic than box vents

400

You got your adj appt scheduled and you were given a 2 hour time frame. What type of inspector is coming out?

3rd party

400

If denial reasoning was due to insurance stating damages were wear and tear/due to old age, what type of documentation is needed and why?

Test Squares, to prove the presence of storm damage

400

What are the 2 indicators of ACV scope?

Brackets and quite literally says non recoverable depreciation on payment page

400

What impact score does UHDZ have?

4

400

How many installation guidelines are there?

17

500

What should you do if a 3rd party is coming out to do the inspection?

Reach out to HO to see if they were given a time the day before, or reach out to the 3rd partys main line the day before/morning of

500

When would getting an ITEL work best?

Insurance pays for shingle repairs

500

What's the difference between an ACV scope, ACV on the payment page and ACV on the line item page?

ACV SCOPE: there will be non recoverable deprecitaion

ACV PAYMENT PAGE: first payment + deductible

ACV LINE ITEM: amount released in first payment

500

What warranty does NS have?

What warranty does HDZ and UHDZ have?

What warranty does Grand Sequoia and Camelot II have?

25 year, non-transferrable 

50 year, transferrable

50 year, transferrable

500

What is supplementing?

If there is an incorrect measurements or missing line items, we let your insurance know and they either agree or disagree. There is the chance of an additional check being sent out

Regardless work will be performed how it needs to be

M
e
n
u