Ergon Softwares and programs
Asphalt and Emulsion 101
Operations/ Equipment
SAP
Project management
100

What distinguishes an EZ form from an full AFE?

$50,000 project value mark

100

What does the "64-22" denotion stand for in asphalt product names?

 the "64" represents the 7 -day average maximum pavement temperature, in degrees Celsius, for which this binder can be used. The second number, "-22," signifies the single day minimum temperature, in degrees Celsius, for which the binder can be used without the likelihood of failure.

100

 This item sends signal waves into the tanks to determine product level

radar gauge


100

When writing a requisition in SAP which category will you enter the dollar amount?

quantity

100

What is the company code for Ergon Asphalt and emulsion & Ergon Asphalt partners?

(165/175)

200

the first step after receiving a project number is to create what & where?

create a project folder - J drive

200

Whats required to make Emulsion

asphalt and soap

200

What piece of equipment heats water into steam

boiler

200

When writing a requisition who is the recipient?

Plant manager

200

What is the initial phase of a project called?

FEL / scope & development

300

when searching for existing specs to send to contractors use this?

policy tech

300

 define the quantity that measures the magnitude of internal friction / resistance in flow i.e. Thickness

viscosity

300

 What is the best piping material for acid applications?

CPVC piping, not metals

300

When populating the header text in a requisition who is that information for?

procurement

300

 P&ID stands for what?

piping and instrumentation diagram

400

Where to you go to comment updates on projects?

smartsheets

400

What type of pump would we use in an asphalt application?

pd pump -> gear pump

400

What are the four methods/ mediums we heat product with?

electric, hot oil, steam, water

400

What is the term that allows us to attach work orders to a piece of equipment?

(functional location)

400

 What type of schedule layout is used to display project timeline?

 gantt chart

500

What is the 3 digit number that designates engineering drawings on the R drive

099

500

What element is needed to react polymer and asphalt

sulfur

500

What are the two main pump types & the main difference?

Dynamic/ Kinetic & positive displacement

500

What 3 digit WBS code is used for "tanks"

- 800

500

You cannot close a project out until this column in the budget summary is cleared out?  

 Commitments