Lactalis Values
Profit Center
Problem Solving
Insights
Industrial Performance
Acronyms
100

What are the 3 values embraced by Group?

  1. Ambition    

  2. Engagement    

  3. With Simplicity 

100

What are the two key topics able to make a CAPEX project successful

Project management and change management

100

Name the method that uses this process


?????????????

100

Name the 4 titles of the of Insights color energies

Firey Red

Sunshine Yellow

Earth Green

Cool Blue

100

True or False:

Mapping is a fundamental skill to be able to represent a complex topics in a short and simple way.

True


100

What does P & L stand for?

Profit & Loss

200

Name the four sections of your Coat of Arms

1) job, roles, career 

2) current position/purpose

3) 3 most important values that define-who you are, the way you do things in life, the way you do things in business 

4) If I were an animal I would be x and why

200

What is the final goal of a continuous improvement process in a Lactalis profit center plant?

Generate the creation of ideas to feed the saving plan and investment plan


200

What is the impact of using the 5 WHYs tactic?

Search for other root causes without stopping at “obvious” causes

200

Each color, on a good day is effective and successful in a work environment. Identify one strength each color demonstrates on a good day.

200

What team exercise was used in sequence
# 1 to demonstrate M²A?

Paper Cup 

200

What does ROI stand for?

Return on Investment

300

 Name three of the five definitions of core values…

1. Important and lasting beliefs or ideals shared by the members of a culture about what is good or band and desirable or undesirable

2. Values provide a sense of common direction

3. Values have a major influence and serve as guidelines for theday-to-day behaviors

4. They are to be transmitted to the succeeding generations

5. The way we do things around here”

300

According the ITP composition, what are the 3 commitments that a manager is expected to deliver in a profit center plant?

1.    Preserve the margin

2.    Achieve the expected performance

3.    Create additional performance

300

Name the 4 main 
stages of the 
approach 

Stage I problem

Stage II Causes

Stage III Solutions

Stage IV Implementation

300

Name one characteristic for each of the color energies, that may negatively impact the team on a bad day.


300

Explain the concept of SMED

•SMED is a Japanese-English acronym that stands for ‘Single Minutes Exchange of Die’

•Literally speaking it means changing die under ten minutes

•Can also be translated by ‘quick tool change’

•This method was developed by Shigeo Shingo for TOYOTA in the 1970’s

300

What does TPM stand for?

Total Preventive Maintenance

400

 Name the three capabilities listed under AMBITION

1-Performance

2- Continuous Improvement

3-People Development



400

What are the actions that appear on the REACTIVITY Scale?

  • Problem Solving Fire Fighting -Fixing Issues (one-off) 

  • Problem Resolving Eliminating Issues (recurrent), Preventing Issues

  • Problem Sourcing Improving overall system


400

Name the percentages

400

Name the 4 Ps for Effective Communication.

Purpose

People

Plan

Big Picture

400

What is the difference between efficiency and productivity…

in terms of unit?

in terms of action plan?

???????????

400

What does RACI stand for?

Who is Responsible

Who is Accountable

Who needs to Checking In

Who needs to be Informed

500

Name the four capabilities listed under ENGAGEMENT

1-Loyalty

2-Accountability

3-Tenacity

4-Entrepreneurship

500

Name one of the conditions of success for a Lactalis Manager when presenting work?

  • Be factual (more data - less blabla) => factual due to your monitoring; 

  • Get straight to the point => transform your project in a factual result able to impact the continuous improvement of the plant; 

  • Think about ITP impact;

  • Demonstrate your ability to manage collectively

500

Name this method and the steps to complete

????????????


500

Provide the four actions to the 4Ps and explain how this model talks to each color energy through the process.

Plan talks to Fiery Red – propose a goal

Picture (big) talks to Sunshine Yellow – paint a compelling vision

People talks to Earth Green - recognize the effect on people

Purpose talks to Cool Blue – shows logic and provides rationale

500

What are the components of Industrial Performance?

Constant improvement of competitive levels by suitable & balanced management of all company resources, to guarantee its development & longevity = Industrial Performance

500

What does 5S stand for?

Sort

Set-in Order

Shine

Standardize

Sustain