SITE
TECHNICAL
OPERATION
BROKEN WIRES/DESIGN FACTORS/VOLTAGES
LOAD CHARTS
100

When can you Block under the beam?

Never

100

What is the standard rope used on most cranes?

Right regular lay

100

During disassembly of a long boom, the hog lines are connected at the maximum cantilever point and the boom is slightly lifted off the ground, which pins are to be removed next?

Bottom pins ahead of the cantilever point

100

What is the maximum number of broken wires, on regular lay running rope, is cause for replacement?

6

100

If the jib is erected but not being used, it is treated as a deduction from the cranes?

Gross Capacity

200

Before setting up the crane on location, what is the first item you check?

Access Road

200

On the majority of conventional cranes, the power is transferred to the torque converter by a?

Master Clutch

200

Test loads shall not exceed ___ of manufacturers load ratings?

110%

200

How many broken wires must be present in one strand of one lay for right, regular lay running wire rope to be removed from service?

3

200
If not listed in the load/capacity charts for a hydraulic crane, and you are in between boom lengths, you should?

use the next longer length or the next shorter length, whichever has the lesser value.

300

What is the best procedure to follow when underground utilities may be present?

Contact local utility company

300

Backward stability of the crane is testes with?

Basic boom at Maximum angle with no load over the side.

300
What does the signal person means when they stand with their hands by the waist side and hands clasps together?

Dog everything

300

The strength factor of wire rope for general rigging and hoisting (without personnel ) must include a safety factor of at least?

5 to 1

300

Jib capacity is based on what?

Structure

400

During setup, how do you determine machine clearances?

Measure the correct distance

400

When using cable or nylon spreaders it is important to remember?

The lower the spreader angle the greater the tension

400

What do you do when you have a slack rope condition?

Check if it is on the drum and sheave

400

What is the strength factor of Pendant lines 

3 to 1

400
The effective weight of the jib when erected from the stowed position?

Increses

500

If a crane is not set up level, and the operator swings a load from the high side to the low side, the load radius will?

Increase.

500

Only approved attachments or extra counterweights made by the manufacturer should be place on the rear of the crane because?

They could cause a backward stability problem

500
What is required on the crane before the use of a manbasket?

Boom angle indicator 

500
How many broken wires at an end socket of a standing wire rope are allowed before the wire rope must be replaced?

1

500

What SWL?

Safe working LOAD