Codes + Life Safety
Integration + FF&E
Construction Docs
Consultant Drawings
Specs + Schedules
100

T/F: ASTM and ANSI are two materials testing agencies which develop and test materials for use in commercial buildings.

False; they do not test materials. ASTM writes standards and procedures for testing, while ANSI approves standards and prevents duplicate standards from existing. 

100
These two types of floor plans are drawn by the interior designer to coordinate electrical locations with MEP. 

What are Power plan and Furniture Plans?

100

These 4 panel substrates are most commonly used in millwork laminating construction: 

1. MDF

2. Plywood

3. Particle Board

4. Hardboard 

100

You would find the locations of ductwork, pipes, grilles and registers on this set of drawings:

What are Mechanical and Plumbing Drawings?

100

A tabular list created by a designer that lists the intended materials to be applied on interior structural elements. 

What is a Finish Schedule?
200

Name the 2 most common tests used to determine the flammability of interior floor finishes. 

Radiant Panel Test

Methenamine Pill Test

200

The typical depth of a plenum space is ______, with variations needed depending on the ceiling heights and type of ductwork being used in a given location (Hard vs soft ducts).

What is 1'-6"? 

200

For applying a clear, high-end looking surface, what finish level would you specify for a gyp wall? 

What is a Level 5 finish?

200

This trait of all buildings is the common cause for material shrinkage, compression, deflection of materials, cracking finishes, etc...

What is Building Movement (AKA Breathing)

200

These are pre-written specifications that cover nearly all types of products, methods of installation, and other variables that relate to a specific product or construction activity. Commonly used by design firms for their reliability and universal application. 

What are MasterSpecs?

300

This fire test is used to test doors, walls and assemblies to see heat transfer and durability. They are responsible for time-based ratings on doors and walls. 

ASTM E119

300

A flooring material's ____ is used to determine the slip-resistance of a particular flooring material. This measurement ranges from 0 - 1 with the higher number translating to a less slippery floor. 

What is COF (coefficient of friction)?

300

In a 2 hour rated exit enclosure, this door rating would be required. 

What is a 1 1/2 Hour Rated Door?

300

You would uses these methods for determining if a wall is load-bearing or not: 

Reference drawings (check wall thicknesses and construction type), Field observation, or Contacting a structural engineer. 

300

This type of specification is the most restrictive for a contractor, but gives the designer complete control over what items an and will be ordered. Can cause expensive items or long lead times. 

What is a Proprietary Specification?

400

Name the 10 major occupancy groups as classified by the IBC (International Building Code). 

What are: 

Assembly, Business, Educational, Factory/industrial, Hazardous, Institutional, Mercantile, Residential, Storage, Utility


400

The three primary ways that sound can be controlled within a space:

1. Reducing the level of loudness of the sound source

2. Modifying the sound absorption in the space

3. Introducing non-intrusive background sound to mask the unwanted sounds

400

Of the 7 major aspects of Constructability list at least 3 of the considerations that a designer must consider when creating detailed drawings:

Connection, Structure, Movement, Tolerances, Clearances, Construction Trade Sequence, Liability.

400
When installing electrical equipment in a restroom or other wet area, you would call out this type of outlet:

What is a GFCI outlet? (Ground Fault Circuit Interrupter)

400

In what MasterSpec division would you find Visual Display Boards, signage, or corner guards?

What is Division 10, Specialties?

500

In an elementary school of 300 students, the flooring material rating you are required to use to reduce the risk of flame spread. (as according to the radiant panel test). 

What are Class II materials? 

500

This testing organization can be referenced to determine the safety, flammability, durability, and structural adequacy of furniture items.

BIFMA (Business and Institutional Furniture Manufacturers Association) and ANSI

500

A small insurance company is moving to a leased space. The designer calculates they will need 4500 ft2 of net assignable area. If the building load factor is 1.20 how much space does the client need to rent to consider leasing? (Consider an efficiency factor of 0.75)

What is 7200 ft2?

Solution:

Gross area = Net area (4500) / EF (0.75)

Rentable area = Gross area (6000) x BLF (1.20) = 7200


500

______ = the vertical loads due to the weight of the building and any permanent equipment. Buildings are designed to accommodate these types of loads, but must also accommodate living loads. 

What are Dead loads?

500

This type of specification lists what results the final construction assembly must achieve, but gives the contractor some choice in how it will be achieve. Most specifications fall between the extremes of Prescriptive specs and _____ specs. 

What is a Performance Specification?

M