Construction & Materials
As-Built Drawings
Construction & Dam Safety
Irrigation
Miscellaneous
200

The acronym VECP refers to this item that can be used by contractors to suggest design alternatives that may be more economical or less costly to install.

What is a Value Engineering Change Proposal

- Reference: NEM 512.3 B

200

This specific ink color must be used exclusively to record field modifications and drawing revisions on construction sheets as they occur.

What is red ink?

  • Reference: TXNEM Part TX512, Subpart F, Section TX512.52(A) (TXNEM Supp... p. 39)
200

To verify continuing physical viability, all issued Personal Protective Equipment (PPE) must undergo a field inspection at this minimum frequency.

What is annually?

  • Reference: TXNEM Part TX512, Subpart G, Section TX512.61(F) (TXNEM Supp... p. 41)
200

This specific official serves as the official technical point of contact for all State irrigation guide development and updates. 

Who is the State Conservation Engineer?

  • Reference: TXNEM Part TX523, Section TX523.1(A)



200

All non-GNSS engineering survey equipment used in Texas must be checked, calibrated, and adjusted at this minimum frequency.

What is at least annually?

  • Reference: TXNEM Part TX544, Section TX544.3
400

For project construction work in Texas, this methodology of evaluating material quality via a pre-approved list is explicitly unauthorized.

What is the prequalification procedure (preapproved list)?

  • Reference: TXNEM Part TX512, Subpart C, Section TX512.23(D) (TXNEM Supp... p. 35)
400

If an individual construction sheet undergoes absolutely zero updates or structural revisions during field installation, it must explicitly bear this written statement.

What is "No changes in Construction"?

  • Reference: TXNEM Part TX512, Subpart F, Section TX512.52(B) (TXNEM Supp... p. 39)
400

This administrative form is used to list multiple tasks, identify potential field hazards, and outline mandatory protective control measures for specific engineering disciplines.

What is a JHA (Job Hazard Analysis) form?

  • Reference: TXNEM Part TX512, Subpart G, Section TX512.62(B)(3) (TXNEM Supp... p. 41)
400

Areas with this specific environmental index value below 19 are considered arid, making them ineligible for limited irrigation planning.

What is the Precipitation-Effectiveness (PE) index?

  • Reference: TXNEM Part TX523, Section TX523.0(A)(2)
400

For designs associated with structures included in the National Inventory of Dams, this specific identification element must be explicitly displayed on the cover sheet.

What is the structure’s NID number?

  • Reference: TXNEM Part TX541, Section TX541.4(C) 
600

Upon receiving formal approval from the SCE, field materials such as concrete, rock, aggregate, and soil can be submitted to this national technical facility for evaluation.

What is the NRCS National Design, Construction, and Soil Mechanics Center?

  • Reference: TXNEM Part TX512, Subpart D, Section TX512.33(B) (TXNEM Supp... p. 36)
600

After field installation finishes, the official full-size copy of the as-built plans must be forwarded to the Design Section within this specific timeframe.

What is 90 days?

  • Reference: TXNEM Part TX512, Subpart F, Section TX512.52(D) (TXNEM Supp... p. 40)
600

This is the minimum duration of construction safety training that all NRCS personnel working on a project site must complete every two years.

What is 4 hours?

  • Reference: TXNEM Part TX512, Subpart G, Section TX512.63(A) (TXNEM Supp... p. 41)
600

When planning an entire system under limited irrigation, micro-irrigation (drip) systems are explicitly required to design for this exact water supply rate per acre.

What is 3 gallons per minute (gpm)?

  • Reference: TXNEM Part TX523, Section TX523.0(A)(2)(a)



600

This specific soil density testing device is exempt from a radioactive materials license and requires no USDA radiation use permit.

What is a Troxler EGauge?

  • Reference: TXNEM Part TX544, Section TX544.1
800

Approval of standard construction materials can be verified onsite by the design engineer or COR/GR using either of these 2 methods. 

What is properly marked material or certification in writing by the manufacturer.

  • Reference: TXNEM Part TX512, Subpart C, Section TX512.21(D) (TXNEM Supp... p. 35)
800

Texas as-built policy requires the generation of three half-size print sets sized exactly to these dimension parameters.

What is 11” x 17”?

  • Reference: TXNEM Part TX512, Subpart F, Section TX512.52(F) (TXNEM Supp... p. 40)
800

According to national policy, this specific type of safety plan must be prepared and kept current for all high-hazard potential dams.

What is an Emergency Action Plan (EAP)?

  • Reference: NEM Part 520, Subpart C, Section 520.27(A)



800

If an irrigation system is split evenly with a 50 percent irrigated to 50 percent fallow management area, it must meet this absolute minimum flow rate parameter per acre.

What is 1.5 gallons per minute (gpm)?

  • Reference: TXNEM Part TX523, Section TX523.0(A)(2)(b) & Figure TX523-1 
800

Aside from the "Specific Site Requirements" section, the core text of an FOTG practice specification can only be altered with the explicit approval of this specific individual.

Who is the engineer responsible for the delegation of Engineering Job Approval Authority (EJAA) for the project’s area

  • Reference: TXNEM Part TX542, Subpart D, Section TX542.30(B)
1000

This report is to advise the State Conservation Engineer (SCE), the Assistant State Conservationists for Field Operations (ASTC(FO)s), and others, of progress of scheduled activities of the Texas Watershed Construction Office (TWCO).

Operations Report of Construction Activities

- Reference: TXNEM 512.43

1000

These two specific entities are designated to receive the two half-size print sets forwarded to the local Zone Office.

What are the local field office and the Sponsoring Local Organization (SLO)?

  • Reference: TXNEM Part TX512, Subpart F, Section TX512.52(F) (TXNEM Supp... p. 40)
1000

This standard national engineering document dictates the structural, hydrologic, and safety design criteria for all NRCS Class C (High-Hazard) dams.

What is Technical Release 60 (TR-60)?

  • Reference: NEM Part 520, Subpart C, Section 520.22(B)



1000

Limited irrigation criteria are strictly barred from being used in fields suffering from these two specific interrelated resource degradation and drainage constraints.

What are water quality and salinity conditions? 

  • Reference: TXNEM Part TX523, Section TX523.0(A)(2)
1000

Subject to the availability of agency funds, Texas NRCS field survey and engineering equipment is systematically scheduled for replacement on this chronological cycle.

What is a seven-year cycle?

  • Reference: TXNEM Part TX544, Section TX544.6(A)(2)
M
e
n
u