100
The time allowed before unescorted physical access must be revoked for terminations. Or how long Jack Bauer has to stop the bad guys.
What is 24 hours?
100
Your “Protection System Maintenance and Testing Program” must include maintenance and testing intervals and their basis and this.
What is Summary of Procedures?
100
Dollar Amount NERC has the authority to assess per day per violation.
What is $1,000,000?
100
TOP-001-1a, R7 ensures a Generator Owner shall not remove Bulk Electric System facilities from service if removing those facilities would do this.
What is burdening Neighboring systems?
100
Under FAC-008 the Operations Manager must do this on an annual basis.
What is conduct Facility Ratings Review?
200
The standard being developed for the Physical Security of substations.
What is CIP-014?
200
This action must happen if a relay or equipment failure occurs which reduces system reliability.
What is notify your TOP or BA?
200
This is a mitigating factor in assessing penalties for a violation.
What are Self Reports?
200
You must provide outage information daily to this Registered Entity.
What is Transmission Operator?
200
A Generator Operator must contact it’s Transmission Operator within this time frame if there is a capability change on a reactive resource.
What is 30 minutes?
300
Process established to ensure that only authorized individuals have unescorted access to our Critical Assets and Critical Cyber Assets.
What are Visitor Control Logs?
300
The three (3) actions you need to do if you have a mis-operation.
What is analyze your Protection System Misoperation, develop and implement Corrective Action Plans, and provide these to the Regional Entity?
300
Entity that oversees the North American Electric Reliability Corporation.
What is FERC?
300
This standard requires you to report damage or destruction of the Facility that results from suspected intentional human action to NERC.
What is NERC Standard EOP-004?
300
Generator Owner shall operate each generator connected to the interconnected transmission system in this manner unless they have notified the Transmission Operator.
What is automatic voltage control mode?
400
Letting someone follow you through an entry without badging. Or a fun event done at ball games.
What is tailgating?
400
These entities are coordinated with should new protective systems and changes to protective systems occur.
What is Transmission Operator and Host Balancing Authority?
400
Contact this group if you are aware of a possible non-compliance issue.
What is the Regulatory Compliance Department?
400
Three (3) types of action could prohibit a Generator Operator from rendering emergency assistance to others as requested.
What are safety, equipment or regulatory requirements?
400
This NERC Reliability Standard will become enforceable January 1, 2015. Its purpose is to manage vegetation located on transmission rights of way and minimize encroachments.
What is FAC-003-3?
500
Requirements around this include: it's length, types of characters used and how often it must be changed.
What is password complexity?
500
Five (5) items specified in the “NERC Glossary of Terms” which comprise a Protection System:
What is Protective relays, associated communication systems, voltage and current sensing devices, station batteries and DC control circuitry?
500
This NERC initiative is to transform the current compliance and enforcement program into one that is focused on Self-Assessment.
What is the Reliability Assurance Initiative?
500
When there is a difference in derived limits the Generator Operator shall always operate the Bulk Electric System to the most __________ ___________?
What is limiting parameter?
500
Each Generator Owner shall maintain the generator voltage or Reactive Power schedule within applicable __________ ___________, as directed by the Transmission Operator, unless exempted by the Transmission Operator.
What is Facility Ratings?