Chromophare
S-Series Booms
COR Lite
Standard of Work
Project Plan
100

Two spring arm types

A.C (Classic)

N.F.C

100

Number of faces on an S-Series service head

Four

100

Number of inputs and outputs on the HUB

4/5 inputs

4 outputs

100

Height set for spring arms

2" below the lowest hanging item in the ceiling

100

System used to find your work order

Salesforce Lightning

200
Acronym U.D.M

Universal Display Mount

200

Length from level nut to bottom of all thread

2 inches

200

This cannot be plugged into the vertical USB port on the 3.1 extender

Keyboard

200

Control ports from 12 to 1 are reserved for these

Non-Stryker products

200

Document that details all contractor contact information

Project Fact Sheet
300

Chromophare Installation Procedure

MAP12423

300

S-Series Boom Quality Inspection Procedure

QIP11324

300

Two devices that must be plugged into a wall outlet

HUB

Audio Amp

300

Direction of stop location

Toward the patient (unless there is an impeding object)

300

Must be completed onsite prior to start of installation

Site Readiness Check

400

CANbus cable used from SK to CFWP

4 pole

400

Number of stops left in each bearing after install for a TC boom

2 upper

1 middle

1 lower

400

Three COR Lite installation options

HUB on doc

HUB in cabinet

HUB on boom

400

First step to de-installing any spring arm assets

Adjust the height

400

Document that details suspension configuration and boom face plate orientation

PE_SOW

500

Use for 7 pole commutator pins

Power

Video

Control

500

Negative flow gases

WAGD 

Vacuum 

500

Two devices (pair) needed to send video signal from the endo cam to the hub. 

HDMI transmitter

HDMI receiver

500

Settings used for labeling interstitials

Wiremarker 1.0

9PT Bold

500

Documents that should be reviewed prior to arriving onsite

PE_SOW

BOM

CADs

PFS

M
e
n
u