Columns
Walls
Concrete
Decks
Random Concrete ?
100

What shaped column is formed by using a fiber form?

Round 

100

 

Perri Domino 

100

A ________ is a large preassembled decking and shoring system spanning between columns and /or walls

Table System


100

When the tendons are stressed after the concrete is placed, the process is known as:

Post Tensioned

100

Define Dead Load

The Weight of the Structure Itself

200

The base of most column forms are held in place with the use of:

Down Board or Sleeper

200


Wedge Bolts 


200


Table System or a Flying Form

200

After the deck forms are stripped, what is used to continue supporting the load until it is sufficiently cured?

Reshores

200

To account for a multitude of variables such as spilling and testing, ___________ percent is added when calculating the required cubic yards of concrete.

5% according to the book

300

A ______________ is a type of vertical support member located above the grade that help support the elevated Deck.

Column

300

A form system made of prefabricated components, usually including a wooden deck and a metal support system that is moved upward from floor to floor, is known as what?

Flying Form

300

The most important element of bolt pattern installation is:

Accuracy

300

The temporary shoring that is used to support a concrete deck is known as:

Falsework

300

To help with stripping, what should be done to taper ties and she-bolts prior to concrete placement?

The Ties should be Greased

400

A thickened section of slab located over the top of a column is known as a:

Drop Panel or Drop Cap

400

What type of material is used in creating a soffit form?

Plywood and Dimensional Lumber 

400

Boxed bays need how many braces for the Proshore system?

4

400

What length do the Pro-Shore mains come in?

6,8,10

400

What supports the post-tensioning tendons in the concrete slab?


Rebar Chairs

500

The ____________ rests on top of the column and is wider than the shaft.

Capital

500

The horizontal steel stiffeners for the steel-frame plywood panels are spaced approximately _______ apart.

Every 1'

500

A concrete slabs that is placed above ground and is supported by structural members such as walls, beams, or columns is a(n)

Elevated Deck, Concrete Deck

500

Plywood runs _______ to the LVL joists.

Perpendicular


500

What is the most dangerous part of commercial formwork decking?

Stripping