What is the standard deductible that applies to all PRP's?
PRP3
100
Post-FIRM buildings in an AE, A1-A30, AH, AO, A (with or w/o BFEs)VE, V1-V30 and V (with BFEs) must have their Elevation Certificates completed by one of these people when it is required.
Who is a licensed surveyor, engineer or architect?
CERT1
100
A crawlspace below the lowest elevated floor, and a garage below or attached to an elevated building.
What are enclosures?
LFG1
100
$50
What is the Probation Surcharge?
GR1
100
Freebie
You get 100 Points
200
RCBAP & Buildings located in the Emergency Program.
What are ineligible PRP Risks?
PRP2
200
Sections A, B, E & F of the Elevation Certificate.
What are the sections of the Elevation Certificate that the property owner or owner's representative can complete for an AO Zone or an Un#A without a Base Flood Elevation?
CERT3
200
The lowest floor for rating of an elevated building in any A zone when any of the following conditions exists:
The enclosed space is finished;
Or the unfinished enclosed space is used for other than building access, parking or storage;
or the unfinished enclosed space has no proper openings.
What is the enclosure floor?
Or
What is C2a?
Or
What is the top of the bottom floor?
LFG1
200
Daily Double 3
As long as the building meets the definition of a historic building, all historic buildings are considered this.
200
All the documentation required for canceling a policy for building sold.
What is a cancellation request form signed by both the agent and insured & proof of sale, removal or total loss.
CN1
300
10/1/2008
What is the earliest map revision date to be eligible for the PRP Eligibility Extension?
PRP1
300
Daily Double 2
This provides a way for a community to document compliance with the community's floodplain management ordinance.
300
These are masonry, poured concrete or precast concrete walls, regardless of height that extend above the grade and support the weight of a building.
What are Foundation Walls?
LFG1
300
ICC coverage does not apply to this program.
What is the Emergency Program?
RATE16
300
Contents covered in a basement regardless of zone or a Post-FIRM enclosure in specific zones.
What is an A/C unit portable or window type, clothes washer & dryer, and food freezer, other than walk-in, and the food in the freezer?
POL14
400
May be endorsed or rewritten as a PRP for only the current policy term.
What is a policy written as a standard B, C or X Zone policy and later found to be eligible for a PRP?
PRP3
400
August 1, 2013
What is the mandatory use date for the 2012 version of the Elevation Certificate?
CERT1
400
To be considered a finished wall, this must be mudded, taped and painted.
What is Drywall?
LFG1
400
Buildings that are located in more than one zone/BFE must be rated using this zone/BFE.
What is the more hazardous zone?
RATE19
400
Zones that are not subject to the Post-FIRM enclosure limitations.
What are B, C, X, D, A, AO and A99?
POL14
500
Prior Zone: D
Policy is currently a SFIP
Current Zone is AE effective 4/15/14
1 Loss on Record for $1000, 1 Loss on Record for $5000
The insured may be eligible for this policy type under these circumstances.
What is the PRPEE?
500
The elevation certificate is always optional in these zones.
What are AR and AR Dual Zones?
CERT1
500
When the garage is separated from other enclosed areas by a foundation wall, it must meet this requirement separately to be excluded from rating.
What is the Proper Openings Requirement?
LFG3
500
The Replacement Cost Ratio for a building that is a business, that is worth $1,000,000 and has a policy with the maximum allowable coverage.
(Hint: V Zones)
What is Replacement Cost Ratio of .50 to .74?
Or
What is 50%
RATE22-23
500
October 1, 1983
November 16, 1990
&
November 16, 1991
What are the designation dates for Coastal Barrier Resource Systems & Otherwise Protected Areas?
CBRS1