PRP/Newly Mapped
Special Certificates
Lowest Floor Elevation
Rating
Potpourri
100
$1,000 and $1,250
What are the standard deductibles that apply to all PRPs? PRP3
100
Post-FIRM buildings in an AE, A1-A30, AH, AO, A (with or w/o BFEs) VE, V1-V30 and V (with BFEs) must have their Elevation Certificates completed by one of these people when it is required.
Who is a licensed surveyor, engineer or architect? CERT1
100
A crawlspace below the lowest elevated floor and a garage below or attached to an elevated building.
What are enclosures? LFG1
100
$50
What is the Probation Surcharge? GR1
100
Daily Double #1
What are the two elements that can be grandfathered? Rate 28-29
200
RCBAP & Buildings located in the Emergency Program.
What are ineligible PRP Risks? PRP2
200
Sections A, B, E & F of the Elevation Certificate.
What are the sections of the Elevation Certificate that the property owner or owner's representative can complete for an AO Zone or an Un#A without a Base Flood Elevation? CERT3
200
The lowest floor for rating of an elevated building in any A zone when any of the following conditions exist:
The enclosed space is finished;
or the unfinished enclosed space is used for other than building access, parking or storage;
or the unfinished enclosed space has no proper openings.
What is the enclosure floor?
Or
What is C2a?
Or
What is the top of the bottom floor? LFG1
200
Daily Double 3
What is a building for which construction or substantial improvement occurred on or before December 31, 1974 or before the effective date of an initial Flood Insurance Rate Map (FIRM)?
200
All the documentation required for canceling a policy for building sold.
What are a cancellation request form signed by the agent & all insureds and proof of sale, removal or total loss? CN1
300
10/1/2008
What is the earliest map revision date eligible for Newly Mapped rates? NM1
300
Daily Double 2
This document provides a way to document a building's compliance with the community's floodplain management ordinance.
300
A building that is elevated on posts, piers, piles, columns or parallel shear walls OR an elevated mobile home enclosed with vinyl skirting.
What is a Diagram 5?
300
ICC coverage does not apply under this program.
What is the Emergency Program? RATE16
300
The only contents covered in a basement regardless of zone or a Post-FIRM enclosure in specific SFHA zones.
What are n portable or window type A/C unit, clothes washer & dryer, and food freezer, other than walk-in, and the food in the freezer? POL 13-14
400
Must be effective within 12 months of the map revision date.
What are Newly-Mapped policies for properties that are newly mapped into an SFHA on or after April 1, 2015? NM 1
400
August 1, 2013
What is the mandatory use date for the 2012 version of the Elevation Certificate? CERT1
400
To be considered a finished wall, this must be mudded, taped and painted.
What is Drywall? LFG1
400
Buildings that are located in more than one zone/BFE must be rated using this zone/BFE.
What is the more hazardous zone/BFE? RATE19
400
Zones that are not subject to the Post-FIRM enclosure limitations.
What are B, C, X, D, A, AO and A99? POL14
500
Prior Zone: D
Policy is currently a SFIP
Current Zone is AE effective 6/15/15
1 Loss on Record for $1000, 1 Loss on Record for $5000
The insured may be eligible for this policy type under these circumstances.
What is Newly Mapped?
500
The elevation certificate is always optional in these zones.
What are AR and AR Dual Zones? CERT1
500
With Obstruction or Without Obstruction
How are elevated buildings in 1981 Post-FIRM V Zones rated? LFG 3-4
500
The Replacement Cost Ratio for a building that is a business, that is worth $1,000,000 and has a policy with the maximum allowable coverage.
(Hint: V Zones)
What is Replacement Cost Ratio of .50 to .74?
Or
What is 50% RATE22-23
500
October 1, 1983
November 16, 1990
&
November 16, 1991
What are the designation dates for Coastal Barrier Resource Systems & Otherwise Protected Areas? CBRS1
M
e
n
u