Concrete Technology
What is the equipment used for setting time of cement
Vicat Apparatus
How many Links are there in 20 meter chain
100 links
Who is the father of Geotechnical engineering?
Karl Terzaghi
Specific Gravity of Water
1
Who is the president of india
Smt. Droupadi Murmu
What is the intial setting time of low heat cement
60 minutes
if starting and ending point is same the surveying is called
Closed traverse surveying
CBR is short for California bearing ratio. This test measures
bearing capacity/ resistance to penetration
Most pollution in india is caused by
Industries
What is digital arrest
online scam