Our Kind of Movie
Substation Compenents
Where does the value come from?
Where Do I Find This?
Process Block
In other Renewable Energy News..
100

We need Wind...but maybe not as much as that old guy who floated away in this 2009 Pixar film.

Up

100

Used to ensure that an electrical circuit is completely de-energized for service/maintenance or emergency

Disconnect Switch

100

Down on Long Island, there is a 5c:

Community Credit

100

In this document, I can find in depth instructions and links to nearly everything the NY PD team needs.

APD Guidebook

100

Projects get kicked off after they have finished Project Hypothes which was formerly called:

PB3 (submission

100

Our country got a first hand look into why distributed energy, reliable grid infrastructure, and batteries are so important during a terrible storm in this state.

Texas

200

A manipulative woman and a roguish man conduct a turbulent romance during the American Civil War and Reconstruction periods - 1939

Gone With The Wind
200

Changes the relationship between the incoming voltage and current and the outgoing voltage and current.

Transformer

200

This is the Incentive offered for NY Solar projects

MWB

200

I want to see a snapshot of the entire NY pipeline, including PB3 forecast dates, 7C submissions dates, IX costs. This document pulls directly from salesforce.

Dev Live Forecast

200

There are a lot of meetings during this step, as we prepare and market, and begin selling our projects to developers.

PB7
200

Last week, the U.S. Senate voted to confirm former Michigan Governor Jennifer Granholm as Secretary of the U.S. ___________, kicking off the administration’s grand plans to shift the country towards decarbonization while boosting the economy.

Department of Energy

300

As a company, we are kinda banking on the popular song from this 1982 classic being the case. It is about a young orphan girl with red hair.

Annie

300

Used to interrupt any short circuits or overload currents that may occur on the network

Circuit Breaker

300

This is a stack of $/kwh rates that NYS utilities must pay for renewable energy.

VDER/Value Stack

300

A snapshot of all PDs IX information can be found in two places - name one.

Smartsheet or NY PD Interconnection Tracking Doc

300

At this process block, we get an LOI signed.

PB1

300

In December, a contract was announced between 174 Power Global and this NY utility to build a 400MWh battery. It will help balance the grid as new offshore wind projects are connected.

ConEdison

400

Every time I hear "Here comes the sun" I think of this 1998 movie starring a young Lindsey Lohan and....another young Lindsey Lohan. 

The Parent Trap

400

Smaller distribution system may use these for for protection

Fuses

400

For surveys conducted by consultants, there are 5 tasks. Generally, we only request task 1-4 down on Staten Island. These projects often don't need to worry about this, where larger upstate parcels can see their margins ~shaded~.

Tree Clearing.

400

Before sending project documents to or buyers, the documents are organized and housed in an:

Internal Data Room

400

During this process block, we are closing out any outstanding items and working on a Bid Set.

6

400
This enormous energy services and delivery company have plans for an 800 MW offshore wind farm off Virginia and North Carolina coasts.

Avangrid

500

Based on a true story - Against all the odds, a thirteen-year-old boy in Malawi invents an unconventional way to save his family and village from famine - 2019

The Boy Who Harnessed the Wind

500

Bonds all equipment frames and metallic structures in the substation, while the connection to the earth is the interface between the electrical system and the earth

Grounding Network/System

500

Discussed a lot in the industry is this idea, where developers on a queue work together to cover huge infrastructure upgrades.

Cost Sharing

500

Folder Structure Path to find a title report is:

Opportunity Folder > Real Estate > Title and Title Review Analysis

500

During this process block, the team is working on receiving permits, optimizing the design, and paying the 25% IX payment

Process Block 5

500

All of this country's energy interconnections with Europe run through Great Britain. As a result of Brexit, the UK is no longer part of the EU’s internal energy market (IEM). Both countries have had increased supply volatility.

Ireland

M
e
n
u