How is CVA Calculated on a PT3 job? (formula)?
CVA = CV - BUD
Which products require factory startup?
All chillers, VRF, KCC, IPAK2
What is your LOA when writing POs?
$10k
Name a reason why we close out projects.
PT 4 - so AM can get paid, To make sure we fulfilled our project scope, and Part of how leaders look at workload.
How do you search in ComfortSite when you have 5 or less characters?
Use the % sign at the end.
How do we handle office fees when we file variation claims?
Certain offices move office fee to commission; whereas other offices leave the office fee alone.
How do you handle labor warranty on a damaged unit when ordering a replacement unit? Who do you send the request to?
Don't order the labor warranty. Have it transferred from the damaged units to the replacement unit. Contact Jo Cook or extended warranty - commercial team.
How do you concession a vendor item (per the TX concession policy)?
PM has to issue a PO to the vendor against the job and file a claim to clear the WIP (Variation Underage, Reduce Multipliers After Shipment)
What report is required to be ran before job can be officially closed?
PRDL
How many health points is a flu shot?
10 health points
Per price increase policy, how will expiring SPAs be handled?
We will not extend SPA’s to hold/protect pricing on a job. If an SPA expires, it is expected that the sales person reprice the equipment using updated list prices and pass along the increase to the customer. Any requests to extend will involve leadership in the office and appropriate RSL.
What is the new mandatory controls rolled out in Sept. ?
Symbio
How do we purchase phenominal aire products? (hint: think vendor name)
Cut a PO to vendor Sunbelt
What two documents are typically included in project closeouts?
IOMs / Warranties / Service Reports / Parts and Service Contacts? / Change projects status in PS after costs have cleared.
What is iReceivables and what application(s) is it replacing?
Enables users to view customer invoices and accounts receivable balances. Replacing IDS.
When a cost hits a PT3 project, what is required to trigger revenue and relieve WIP?
Enter variation claim
What is the difference between CV, SZVAV and VAV?
CV = Constant volume discharge for a single space; SZVAV = single zone VAV for modulating speed in a single space; VAV = variable air volume w/VFD to modulate fan when boxes for multiple spaces.
What is the different between TAP error and Match Exception
Second level - AP has already matched a cost to the PO line and nothing else can be matched to that PO line. First level - TAP is any discrepancy with costs, items, or vendor address.
How long is the variation reserve available until it gets absorbed into the company?
Falcon sends an email after 3 years and then does a split and close if there is no activity.
In WMS when would you use Dallas Claims vs Dallas Equipment and Contracting to file a claim?
Dallas Claims is associated with WS#s (cost is on service job) / Dallas Equipment and Contracting is associated with 3rd party customer that needs reimbursement.
What is the RR calculation?
Actuals / Budgets * Total Contract Value = The Revenue Recognition
What are the 3 requirements on all RAUJ projects?
Approval by Ralph. Trane service startup. Must be approved by local ASM.
What is our business unit we use in PS for vendor POs?
AP101
What are the consequences of re-opening a PT4 project?
The commission is reversed until the project is closed again. If you do this, make sure you open and close within the same month billing cycle, so you don't have unhappy AMs!