Linear
Procurement
HS&W
Energy
HR
100

The name of a sewer that conveys both wastewater and storm water

Combined sewer

100

The number of full time employees a US vendor must have in Canada to be considered a Canadian vendor under the new Procurement Restriction Policy?

250

100

This is the program acronym for identifying hazards and correcting them to prevent injuries

DWB program

100

Examples are RNG, Solar, wind, hydro, and geothermal heat

Renewable energy

100

What is the termination notice for fixed term employees with over one year of service?

16 weeks


200

This is the most common size for a collection pipe

8 inches

200

As per the recommendation in the OPS Procurement Directive, when conducting a RFQ (run at the local level within the region) for a service that is valued at greater than $30,300 but below $121,200, this is the number of vendors that should be invited for it to be considered a competitive process

3 or more qualified vendors

200

The goal of this OCWA program is to promote planning work prior to starting a job task or process

Tailgate Meeting program

200

The unit used to measure electrical energy consumption

Kilowatt-hour (kWh)

300

The spray paint colour typically used to indicate a watermain when locating

Blue

300

When determining the proper procurement pathway to be used i.e. local level RFQ run at the regional level or an open competitive process posted on Jaggaer, do we consider 1) the value of the contract per year, 2) per original term prior to potential extensions, or 3) the entire value if all extensions are implemented.

Entire value if all extensions are implemented.

300

This lagging safety KPI refers to the total number of lost time and medical treatment incidents

RIR (Recordable Incident Rate)

300

The megawatt hourly usages required to be considered a Class A facility

Over 1 megawatt hourly usage

400

A type of valve that ensures flow is always in one direction

Check valve

400

This recently released OCWA program has a key pillar pertaining to Psychological Safety

OCWA’s Mental Health and Wellness program

400

This is the role of the Independent Electricity System Operator (IESO)

Manages the Province’s supply & demand of the energy grid. It plans and prepares for current and future electricity needs of the Province.

500

What was the diameter of the pipe that failed in Calgary in 2024?

2000mm (or 80 inches)

500

This OCWA committee could be activated during a level 3 emergency

Emergency Action Group or EAG

500

A highly efficient energy system that generates both electricity and useful heat from the same energy source. Instead of wasting excess heat produced during electricity generation, this system captures and uses heat for heating buildings, industrial processes, or even additional power generation.

CHP

M
e
n
u