Basecamp
Kaiser
HCAI / OHSPD Processes
Building Code
General Office
100

This person will set up the BIM 360 project

Who is Dan

100

Kevin Herr, Bradley Wilson, Ursula Duhe, Carlos Godina, Harley Batchitar

Who are Kaiser Project managers

100

This document must be uploaded to HCAI by the architect prior to the start of construction.

What is a construction start notice

100

The size of the turning circle for accessible spaces

What is 60" diameter

100

The place where used coffee grounds go 

What is the trash

200

Adding too many people to a task or uploaded document(s).

What is SPAM

200

John Gilbert , Jim Hawkins, Steve Rosson, Steve Martino, Scott Drane

Who are KP PMs that Joy has retired

200

The HCAI field staff trio is comprised of.

Who are the Compliance officer (CO), District Structural Engineer (DSE), and Fire Life Safety Officer (FLSO)

200

A standard rated corridor is constructed with what type of rated construction.

What is a fire partition.  

200

Amount of time to allow for internal office peer review.

What is ideally 48 hours.

300

This lets you assign multiple people to task or project at once.  

What are groups.

300

Either ____ or ____ from the owner is required to officially begin working on scope changes 

What is a change directive or approved change order.

300

A minor change or clarification to the approved documents that accompanies a RFI

What is a NMA form.

300

Accessibility.  The max reach height of a wall mounted object mounted above a 24" deep counter.  

What is 44"

300

The most current Revit templates and standard details are located here

What is the google share drive.

400

Card tables are used for.

What are Submittals and RFIs

400

All projects shall follow these interior design guidelines.

Bonus: they can be found here.

What is KPBE, Kaiser Permanente Brand Elements

Bonus: Infozone

400

In additional to drawings, calculations, product data, and reference documents, this is also required for the initial plan review.

What is a functional program.

400

The code section for Radiological Diagnostic Imaging Spaces 

What is 1224.18

400

All drawings, sketches, or milestone packages that are sent out of the office to the client or contractor shall be reviewed by.

Who are Mike or Dan


500

Templates in Basecamp can be used for projects and

What are task lists

500

eBuilder. To make your submittal visible to the project team

What is click the "show" hyper text or button.

500

Documents and actions required for supplanting or adding another IOR to the project.

What are the IOR Application, IOR Workload report, and IOR Matrix

500

The code section(s) that identifies when an OSP is required in an acute care hospital.  

What is CBC 1705A.14.3

500

The next office birthday

Who is Trent

M
e
n
u