SAP
WorkPro
Work Requests 1
Work Requests 2
By the Numbers
100

Which work center is accessed to view service notifications?

Display Notifications

100

Which symbol is used for the wildcard search in WorkPro?

% (Percent sign)

100

For a lighting WR, what number should be added to the References tab?

Lighting Installation number 

100

All Dade City work is to be assigned to _____ service area.

PCA

100

For a meter pole, how much is the deposit calculation per amp?

$2.00

200

What is the T-code for locating the service area and grid number?

ECENV_CO

200

Which field on the General tab is used to list details/specifics of the request?

Extra Info

200

If a customer's home/business was not impacted by a fire, which email address should they send the E268 form?

Release@tecoenergy.com

200

For a Christmas tree stand, what are the numbers listed for the Town and Tax codes, in the WR?

12 and 12

200

What is the minimum voltage amount offered for buildings.

120/240

300

Which T-code is accessed to add/remove an inspections required alert?

ES61

300

For electricity at a newly built home, what information should be included in the Extra Info field?

Subdivision, lot, block, amps, volts, phase, and square footage

300

When a customer requests to have a pole painted, what goes in the "Building" field in the WR?

Pole Painting

300

Which two counties does not require a government inspection?

Hillsborough and Pasco

300

How many days from the date of the complaint being received should the Required Date be for a Complaint WR? 

2 Days

400

In the T-code: ECENV_CO, which folder must be accessed to view the service area and circuit number?

Device Location

400

If a WR was cancelled during the four-hundred requirement series, the status will display?

4X

400

Which remark type is used when a customer/contractor advises that the repairs have been made, so a meter can be set?

NOMT

400

If a customer is calling in for access or info about land owned by TECO, instead of a WR, which system is accessed to submit a request?

TEC Distribution Land Rights

400

What is the activation fee for a T-Pole?

$320.00

500

In the Interaction Record work center, which section would you click on to view the full name of the Team Member that entered in an IR selected?

Partner

500

Which fraction is used to indicate a lift station?

1/7

500

If a customer missed their Lighting appointment, an One Source CER should send an email to the LFET and CC the LFET's Supervisor with the follow items:

-Name of Customer

-Phone Number (Best time to call)

-WR Number

-Advise that customer missed their appointment

500
How many days out from the creation date, should be the Required Date for a Fault Current WR?

7 Business days

500

Which requirement is added to the Work Queue, if a caller states that their pole is now up & ready?

460 - TEC Release Recieved

M
e
n
u